Haier 10515194 Installation Manual

Manual is about: Room Air Conditioner Installation Manual

Summary of 10515194

  • Page 1

    No.0010515194 installation manual of room air conditioner drawing for the installation of indoor and outdoor units no. Accessory parts remote controller r-03 dry battery mounting plate drain hose screw plastic cap drain-elbow cushion 1 1 a b c d e f g 2 3 4 5 6 7 2 1 1 4 1 4 number of articles acces...

  • Page 2

    Fixing of outdoor unit indoor unit selection of installation place power source selection of pipe outdoor unit fix the unit to concrete or block with bolts( 10mm) and nuts firmly and horizontally. When fitting the unit to wall surface, roof or rooftop, fix a supporter surely with nails or wires in c...

  • Page 3

    Indoor unit 1.Fitting of the mounting plate and positioning of the wall hole 2.Making a hole on the wall and fitting the piping hole cover when the mounting plate is first fixed when the mounting plate is fixed side bar and lintel 1.Carry out, based on the neighboring pillars or lintels, a proper le...

  • Page 4

    Indoor unit 3.Installation of the indoor unit 4.Connecting the indoor/outdoor electric cable drawing of pipe fixing the indoor unit body removing the wiring cover rear piping left left-rear piping other direction piping draw pipes and the drain hose, then fasten them with the adhesive tape in case o...

  • Page 5

    Indoor unit when connecting the cable after installing the indoor unit when connecting the cable before installing the indoor unit 1. Insert from outside the room cable into left side of the wall hole, in which the pipe has already existed. 2. Pull out the cable on the front side, and connect the ca...

  • Page 6

    Outdoor unit 1.Installation of outdoor unit 3.Connection 4.Attaching drain-elbow 2.Connection of pipes install according to to bend a pipe, give the roundness as large as possible not to crush the pipe. Connecting the pipe of gas side first makes working easier. The max vertical distance between the...

  • Page 7

    Outdoor unit 7 5.Purging method: 3-way valve 2-way valve 6.35mm(1/4") 9.52mm(3/8") 12.7mm(1/2") push the air out of the indoor unit and piping as followes: (1) remove the valve cap on 2-way valve in outdoor unit. (2) loosen by 1/2 turn the flare nut of gas pipe, which is conneted to 3-way valve. (3)...

  • Page 8

    8 1.Power source installation 2.Cutting and flaring work of piping check for installation and test run check items for test run the power source must be exclusively used for air conditioner. (over i0a) in the case of installing an air conditioner in a moist place, please install an earth leakage bre...