Haier AD142AMBEA Operation And Instruction Manual - page 15
14
Installation Manual For Indoor Unit
a
b
c
d
e
f
g
h
i
500
830
450 225 80 225 123 22
100
950
1105 450 225 50 225 123 12
100
Model
AD142AMBEA
051222
*****
Fig 2
After selecting the unit installation location, proceed the following steps:
h
a
i
e
f
g
b
c
d
Installation dimension: (Unit: mm)
1. Drill a hole in the wall and insert the connecting pipe and wire through a PVC
wall-through tube purchased locally. The wall hole shall be with a outward down
slope of at least 1/100. (See Figure 2)
2. Before drilling check that there is no pipe or reinforcing bar just behind the drilling
position.
Drilling shall avoid at positions with electric wire or pipe.
3. Mount the unit on a strong and horizontal building roof. If the base
is not firm, it will cause noise, vibration or leakage.
4. Support the unit firmly.
5. Change the form of the connection pipe, connection wire and drain
pipe so that they can go through the wall hole easily.
AD182AMBEA
AD182AMAEA
AD182AMBFA