Installation page 2 english f a c e d the marks from to in the figure are the parts numbers. The distance between the indoor unit and the floor should be more than 6.5 ft. The models adopt hfc free refrigerant r410a more than 4 in. More than 4 in. More than 4 in. More than 8 in. More than 6 in. More t...
Installation page 3 english 2.1 step 2.1 using a stud sensor, locate and mark the stud positions in the wall where the indoor unit is to be mounted. 2.2 step 2.2 place the mounting plate on the wall in the desired location taking into account the minimum clearances necessary for proper operation. Us...
Installation page 4 english illustration 2 illustration 3 2.9 step 2.9 with the top of the indoor unit closer to the wall, hang the indoor unit on the upper hooks of the mounting plate. Slide the unit slightly side to side to verify proper placement of the indoor unit on the mounting plate. Rotate t...
Installation page 6 english hazard of explosion! Never use an open flame to detect gas leaks. Explosive conditions may occur. Use a leak test solution or other approved methods for leak testing. Failure to follow recommended safe leak test procedures could result in death or serious injury or equipm...
Installation page 7 english illustration 6 it becomes high midway. The gap with the ground is too small there is the bad smell from a sewer it waves. The end is imm- ersed in water. Less than 5cm piping hole. Use a sealant to seal the piping hole opening to prevent weather elements from entering the...