IBC Water SAS0922 Installation And Operating Instructions Manual

Summary of SAS0922

  • Page 1

    Sas0922 page 1 water softener semi automatic installation & operating instructions model : sas0922 serial no : ……………………….. Telephone: (07) 3219 2233 facsimile: (07) 3219 2266 email: sales@ibcwater.Com.Au website: www.Ibcwater.Com.Au filtration & water treatment products for commercial, industrial an...

  • Page 2: Hardness Test

    Sas0922 page 2 1. Water to be tested should be taken from a tap after the water softener 2. Measure 10ml of water into plastic bottle supplied (approximately 1/3 full) 3. Add one yes/no tablet to sample water, replace cap and shake until tablet has completely dissolved. (note: do not handle yes/no t...

  • Page 3: Model  Sas0922

    Sas0922 page 3 to ascertain days between regeneration periods the following data or estimations are required. (let n be the number of days to be calculated) .1. ð water hardness in mg/l call ð h .2. ð water softener hardness removal capacity from table 1 in grams call ð c .3. ð daily water usage in ...

  • Page 4: Location  &  Installation

    Sas0922 page 4 location & installation 1. The softener requires an inlet water pressure between 140kpa (20psi) and 690kpa (100psi). 2. The softener should service all water lines in the house except the toilet and outside taps. The softener should be positioned on a level flat surface close to a dra...

  • Page 5: Brine  Tank

    Sas0922 page 5 placing the softener in service 1. Turn the timer knob full clockwise from “off” to “off” ie. A time of 2 hours and open the inlet valve slightly. Slowly fill the resin tank. Air and water will be expelled out the drain line. 2. Open the inlet valve fully, the brine tank should fill t...

  • Page 6

    Sas0922 page 6 during regeneration raw (hard) water is bypassed to service so it is advisable to regenerate the unit when water is not needed..

  • Page 7: 541-030 Valve

    Sas0922 page 7 water conditioning control system installation, operating and maintenance manual 541-030 valve.

  • Page 8

    Sas0922 page 8 the service cycle position directs untreated water to flow down through the resin bed in the mineral tank and up through the riser tube. The water is conditioned when passing through the resin. The slow rinse cycle position directs a slow flow of water down through the riser tube and ...

  • Page 9

    Sas0922 page 9 parts list item p/n description qty 1. 15-88 screw, backcap 4 2. 541-207 backcap, 3 cycle 1 3. 541-206 seal, backcap 1 4. 541-239 return spring, check disc 1 5. 541-246 check disc 1 6. 541-325 gasket, injector 1 7. 428- injector (specify size) 1 8. 541-221 cover plate, injector 1 9. 1...

  • Page 10

    Sas0922 page 10

  • Page 11

    Sas0922 page 11 troubleshooting guide problem cause solution 1. Unit fails to regenerate. A. Low inlet pressure. B. Drain line restricted. C. The brine injector is plugged. D. Main diaphragm is torn. E. Regeneration length too short a. Verify that the service inlet pressure is a minimum of 20 psi. B...

  • Page 12

    Sas0922 page 12 parts replacement general information familiarise yourself with the parts replacement procedures and component parts thoroughly before attempting any repair. Insure that the unit is in the bypass position and relieve the system pressure before attempting any repair procedure. Require...

  • Page 13

    Sas0922 page 13 injector and filter screen replacement 1. Place the bypass valve into the "bypass" position. 2. Relieve the system pressure. 3. Remove the three (3) screws from the triangular cover plate. 4. Lift away the cover plate. 5. Remove the injector from the valve body and separate the gaske...

  • Page 14: Brine Valve Assembly

    Sas0922 page 14 brine valve assembly windsor cabinet model float distance (x) sas0715 100mm sas0922 200mm sas1029 260mm adjustment of softener brine valve 1. Lift float rod to full up position. 2. Set float to distance shown. Measure from the top of the crown nut to the bottom of the float..