    Installation instructions installation of field feature bill of material (ffbm) pn 10k8798 install network node control point (nnp-b) type 5 (based on 6578) feature code 5425 on ibm 3746-900 written by: c. Vallee modified by: j. Maher checked by: c. Franoux approved by: a. Badino reviewed by: r. Lym...

  • Page 2

    Installation instructions 3746 pn 42l2445 ec f52322 ec f12701a ec f70078 ec f70110 ec h10024 ffbm 2 of 10 09 oct 1998 14 dec 1998 22 apr 1999 20 jan 2000 08 mar 2001 2.

  • Page 3: 1.0 Machines Affected

    Installation instructions before installation (steps 1-8) 1.0 machines affected 3746 model 900 with service processor and network node processor type: 6578-rau, 6563-65u, 6275-56u, 6275-83u, 7585-p02, or 3172-p90. This feature should only be applied on the machine serial number for which it is speci...

  • Page 4: 2.2 Concurrent Ecs

    Installation instructions 2.2 concurrent ecs (must be installed together) none. 2.3 companion ecs (may be installed together) none. 3.0 bms to be installed feature b/m title 10k8798 network node processor b (nnp-b) feature code 5425 4.0 preparation 1. Familiarize yourself with the purpose and detail...

  • Page 5: 6.2 Description

    Installation instructions 6.2 description the installation of the nnp-b is divided into two main steps: 1. Installing the 6578-rau system unit. 2. Loading the code on the nnp-b. Note: these steps are documented in the network node processor installation and maintenance (based on 6578), gy27-0407. 37...

  • Page 6: 7.0 Installation Time

    Installation instructions 7.0 installation time note: to reduce the mes installation time it is recommended that you load the network node processor code on the service processor and install the system unit at the same time. No impact on 3745 customer operations. Ffbm machine hrs. System hrs. Nbr of...

  • Page 7

    Installation instructions 10.2 enabling the nnp back-up function important it's a customer task, but ask the customer if he wants you to perform this task. 1. On the 3746-9x0 main menu, click on network node processor man- agement. 2. Double click on manage control point on nnps. 3. Click on enable ...

  • Page 8: 10.3 Logging Off The Moss-E

    Installation instructions 10.3 logging off the moss-e 1. On the 3746-9x0 menu window, click on function, then click on exit. 2. On the moss-e view window, click on program. 3. Click on log off moss-e. 4. Close the front and rear doors of the controller expansion. 10.4 returning the machine to the cu...

  • Page 9: 15.1 Purchased Machines

    Installation instructions 15.1 purchased machines refer to the parts ownership matrix to determine the correct owner of removed/unused parts. For emea/apg/ag areas, refer to hardware and general service code description. For domestic areas, return parts to the customer. 16.0 machine records install ...

  • Page 10