Zz17-w2001-b 1 yy-w2xx pedestal server chassis yy-r5xx 5u rackmount server chassis installation guide 2005.04. Version b.
Zz17-w2001-b 2 index 1. Introduction 2. Hardware packing list 3. System installation 3.1.Chassis open 3.2.Motherboard installation 3.3.Add-on card installation 3.4.Cd–rom drive/fdd installation. 3.5.Fixed hdd cage , hdd installation 3.6.Instructions for switches and led indicators on front panel 3.7...
Zz17-w2001-b 3 1. Introduction yy-w2 series server chassis is designed in compliant with eeb3.0 specification (refer to www.Ssiforum.Org ) and atxv2.1 (refer to www.Formfactors.Org) mother board: z yy-w2 is designed for extended atx (12"x13"), in compliant with atx spec, ceb and eeb3.0 spec. Z stora...
Zz17-w2001-b 4 thermal solution: z one(1) 120x120mm cooling fan is installed, rear mounted z options of two (2) 60*60*25mm, rear mounted. Switches and led indicators on front panel z power switch (push switch) z reset button (push switch) z power on led (green) z hdd led (orange flash) z fan alarm (...
Zz17-w2001-b 5 2. Hardware packing list when you unpack your yy-w2 server chassis, check that all the items that you ordered are present in good condition. Review the inventory checklist below to be sure that the components and optional components that you ordered are included. If anything is missin...
Zz17-w2001-b 6 3. System installation 3.1 chassis open to release two (2) screws on the rear side of chassis, pull the side cover with handle. 3.2 motherboard installation check mounting holes of motherboard, to screw the standoffs required to chassis. Put the motherboard into the chassis, than scre...
Zz17-w2001-b 7 3.3 pci add-on card installation remove the tail gate bracket, install pci card into motherboard, and screw in bracket to rear window of chassis. The chassis could be optional required a card clamp holder which is used to clamp the add-on card for avoiding any popping issue. To remove...
Zz17-w2001-b 8 to remove the front panel fist, the front panel is snap in chassis with hocks (or/and screw on by 4pcs screws), please screw off the screws and pull the front panel forward. Z to remove the metal covers (vented panel). Z screw a pair of rails to drive. Z slide in the drive install cha...
Zz17-w2001-b 9 to screw off four (4) screws in the front plate of chassis, the hdd cage could be removed from chassis, install hdd into cage. The cooling fan of hdd cage could be easy swap, release two thumb screws in the front of hdd cage, lift off the fan holder, swap fan and assembly again into c...
Zz17-w2001-b 10 3.6 instructions for switches and led indicators on front panel the switches and led indicators on front panel have the functions as following: power sw: push switch, the system power on/off, connects to m/b. Reset sw: push switch, connect to m/b x powr led: the system power led (gre...
Zz17-w2001-b 11 optional intrusion switch the chassis could be built with intrusion switch, assembly in left side of chassis, when side cover removed the system will alarm for intrusion, if connected. 3.7. Instructions for cooling fan assembly the chassis could be mounted optional two 60x60 cooling ...
Zz17-w2001-b 12 3.9 system assembly when above steps are done, properly connect all accessories to the system. Then the user can start to install the o/s and required software to the system according to the instruction on the manual of motherboard. 4. Introduction of ide/scsi/sata multi-bay backplan...
Zz17-w2001-b 13 5. How to change versatile as rackmount chassis (5u) 1. To remove top cover and bottom cover of chassis. 2. Screw in rack bracket and handles type a+ si-0357 x 1 type a+ si-0237 x 2.
Zz17-w2001-b 14 3. Slide into eia cabinet.