Ibm 8260 nways multiprotocol switching hub installation instructions for atm control point version 3.1.9 pnni installation instructions copyright ibm corp. 1998 page 1 june 17 1998 ec : f34705 pn : 26l0227.
Table of contents 26 2.9 publication update . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 2.8 .1 example of a migration to pnni phase 1 (see figure 3) . . . . . . . . . . . . . . . . . 15 2.8 set minimum pnni phase-1 parameters. . . . . . . . . . . ...
1 upgrade synopsis in-band code download on the a-cpsw make redundant a-cpsw active save your configuration, to be able to reload it in case of problems. Download a-cpsw operational microcode download a-cpsw fpga picocode boot microcode no redundant cpsw, or both cpsw are downloaded swap fpga picoco...
1.1 prerequisites the minimum fpga level required for a-cpsw is b52. 1.2 copying operational/boot and fpga a-cpsw codes on your workstation 1.2 .1 code from distribution diskettes the present kit contains 2 diskettes : 1 the diskette, part number 26l0255, contains for a-cpsw 8260: a notice file (rea...
Sa33-0452. Ibm 8260 nways multiprotocol switching hub ibm 8285 nways atm workgroup switch atm control point version 3 user's guide. Sa33-0453. Ibm 8260 nways multiprotocol switching hub ibm 8285 nways atm workgroup switch 1.2 .1.2 copying the distribution files on your workstation 1 insert the distr...
These files must be placed in a directory reachable through tftp, like /tmp for a unix/aix station, so that in-band download toward the cpsw can be performed. After package file has been downloaded and unzipped, on an aix workstation make sure that the files can be read by all users : log in as "roo...
4. Check that you can ping the tftp server from the 8260 lec. Ww serial line ip support (slip) mode.Make sure your workstation can act as a tftp server . 1. Set up a a-cpsw configuration console in slip mode: 2. Then configuring the slip interface on the tftp workstation will allow you to perform in...
2 upgrading the 8260 you should migrate your network cluster by cluster and you should download the fpga code and microcode on all your 8260 and 8285 switches (in the cluster) before performing any swap command. Note that interoperability between v.2.X.X clusters and v.3.X.X peer groups is possible ...
2.2 step 2: download inband the 8260 a-cpsw operational microcode upgrade the new active a-cpsw operational microcode as follows: 1 configure the tftp parameters by entering the following commands: set tftp server_ip_address set tftp file_type operational set tftp file_name type the full path name o...
Set tftp file_name type the full path name of the fpga file when prompted set tftp target_module (n=9 or 11 depending of active a-cpsw position) . Save tftp 2 make sure you can reach the tftp server by entering: ping (stop ping by entering: ctrl+c) 3 start the download inband procedure by entering: ...
Make sure you can reach the tftp server by entering: ping (stop ping by entering: ctrl+c) start the download inband procedure by entering: download inband when prompted, type "y" to confirm. Wait for successful termination of the download operation. The message download successful is displayed. This...
2 fpga code (if necessary) 3 boot code 4 activate the new version of a-cpsw fpga. Picocode by entering the command: save all swap fpga_picocode 9 (or 11).The telnet session, if any, is broken. Login as administrator on the a-cpsw console. 5 activate the new version of a-cpsw microcode by entering th...
2.7 step 7: check the new levels of codes : 1 login as administrator on the active a-cpsw console 2 the following table lists the microcode and fpga versions that must be displayed at completion of the upgrade. Use the following commands show device show module n verbose v.3.1.9 v.3.1.9 b52 a-cpsw b...
2.8 set minimum pnni phase-1 parameters. Note that interoperability between v.2.X.X clusters and v.3.X.X peer-groups is possible through nni and iisp link respectively. Figure 2, represents a network configured with 8260/8285 at the atm firmware kit level mes5099. In this example there are two subne...
Installation instructions copyright ibm corp. 1998 page 15 june 17 1998 ec : f34705 pn : 26l0227 subnetwork x (atm address 39.99.99.99.99.99.0.9.77.77) subnetwork y (atm address 39.99.99.99.99.99.99.0.0.88.88) nni vpi0 cluster 3 (acn=3) ws 3 4.3 6.1 hub d (hn=1) figure 2. Example of a network at the...
2.8 .1 example of a migration to pnni phase 1 (see figure 3) figure 3 represents your network after migration to pnni phase-1 (v.3.1.0). You can note that cluster changes to peer group ssi changes to pnni nni changes to iisp. Installation instructions copyright ibm corp. 1998 page 16 june 17 1998 ec...
Installation instructions copyright ibm corp. 1998 page 17 june 17 1998 ec : f34705 pn : 26l0227 subnetwork x (atm address 39.99.99.99.99.99.0.9.77.77) subnetwork y (atm address 39.99.99.99.99.99.99.0.0.88.88) ws 3 4.3 6.1 hub d (hn=1) figure 3. Example of a network in level pnni phase 1 (v.3.1.0) w...
2.8 .1.1 migration of peer group 1 - hub a ---atm address setting --------------------------------------------------- after having completed the swap, the atm address has been migrated to the node-0 atm address, but the pnni summary address was set to a default value. So you need to enter the old at...
--- atm address setting --------------------------------------------------- after having completed the swap, the atm address has been migrated to the node-0 atm address, but the pnni summary address was set to a default value. So you need to enter the old atm address again, with a new selector, by i...
For each logical link in v2.X.X (if vpi was not equal to 0) you must define a vpc link in v3.1.0 : 1. To set your new vpc_links, you need the v2.X.X parameters you have written down in step 6. Example for old cluster 1 hub b (figure2), now peer group 1,hub b (fig 3): the vpi on the logical link 3.1 ...
2.8 .1.3 migration of peer group 2 - hub c --- atm address setting --------------------------------------------------- after having completed the swap, the atm address has been migrated to the node-0 atm address, but the pnni summary address was set to a default value. So you need to enter the old a...
--- virtual path channels setting (vpcs) : -------------------------------- for each logical link in v2.X.X (if vpi was not equal to 0) you must define a vpc link in v3.1.0 : 1. To set your new vpc_links, you need the v2.X.X parameters you have written down in step 6. Example for old cluster 2 hubc ...
2.8 .1.4 migration of peer group 3 - hub d --- atm address setting --------------------------------------------------- after having completed the swap, the atm address has been migrated to the node-0 atm address, but the pnni summary address was set to a default value. So you need to enter the old a...
--- reachable address setting : ------------------------------------------- --- now try to ping.. ---------------------------------------------------- to be sure you have successfuly completed pnni installation, in the case you have set tcp/ip parameters in a classical ip or lan emulation network, e...
2.9 publication update insert the companion release note, part number 26l0228, ec level f34705 in your publications binder. End of document installation instructions copyright ibm corp. 1998 page 25 june 17 1998 ec : f34705 pn : 26l0227.