    Installation and operation manual ecowood 25 jaspi knows heating w w w.Jaspi.Co.Uk.

  • Page 2: Uk Technical Helpline 0

    2 (8) eu insurance certificate of compliance the insurance certificate pertains to jÄspi tupla, triplex, ecopuu, ypv 40, and vpk hand filled solid-fuel boilers manufactured by our company. We hereby certify that the entire development of the above boilers meets the safety requirements as in chapter ...

  • Page 3

    3 (8) 1. Technical data power: 25 kw weight: 290 kg nozzles: 1 storage battery supply 2 storage battery return 3 expansion 4 draft control 5 cooling coil 6 drain 7 thermal valve 8 flue 9 flue connection furnace parts: 10 background brick extension 11 background vertical brick 12 side brick (2 pcs.) ...

  • Page 4

    4 (8) 2. Operating principle firewood (coal, briquets) is burnt on the ceramic grate on the basis of the rotary / lower combustion principle. Combustion air flows precisely where needed: to the furnace top, onto the fire bar, and down the bar into the firing throat for the final combustion phase to ...

  • Page 5

    5 (8) f ig . 3 c o n n e c ti o n e x a m p le 1 : s o lid -f u e l b o ile r a n d e n e rg y s to ra g e 1 b o ile r (j Ä s p i e c o p u u -2 5 ) 5 c h a rg e p u m p ( u p s 2 5 -6 0 ) 9 b o ile r c o o lin g c o il 2 e n e rg y s to ra g e b a tt e ry ( j Ä s p i o v a l i) 6 e x p a n s io n t...

  • Page 6

    6 (8) f ig . 4 c o n n e c ti o n e x a m p le 2 : d ie s e l/ g a s b o ile r, s o lid -f u e l b o ile r, a n d e n e rg y s to ra g e 1 d ie s e l/ g a s b o ile r (j Ä s p i s o l a r 1 7 ) 7 h e a ti n g l o o p c ir c u la ti n g p u m p 1 3 1 .5 b a r re lie f v a lv e 2 s o lid -f u e l b o ...

  • Page 7

    7 (8) 4. Boiler operation caution ! While filling and cleaning the furnace, keep in mind that the background vertical brick (part number 11) is not shock-resistant. Use a small amount of firewood for the first burning process to avoid bar splitting by boiling water that could soak in. - to get wood ...

  • Page 8

    8 (8) 5. Boiler cleaning clean the boiler at the front. Remove ash from the bar brick (14). Remove the firing throat (16) and shake ash out; thus, it is also used as an ash box. Open the cleanout port (22), remove the turbulators (18 and 19), and clean the ducts with the brush supplied in the boiler...