Lamborghini Caloreclima Xilo T 20 MS W TOP Installation And Maintenance Manual

Manual is about: WALL-HUNG GAS BOILER FOR HEATING - HIGH EFFICIENCY - MODULATING

Summary of Xilo T 20 MS W TOP

  • Page 1

    Installation and maintenance manual please make sure that the "use manual" is handed over to the user 20 ms w top /ie certificated company iso 9001 wall-hung gas boiler for heating - high efficiency - modulating.

  • Page 3: Irish

    Read carefully all warning and instructions contained in this manual at they give important safety instructions regarding installation and maintenance. Keep this manual for future reference. Installation must be carried out by qualified personnel who will be responsible for respecting existing safet...

  • Page 4

    4 congratulations... ......On an excellent choice. We thank you for the preference accorded to our products. Lamborghini caloreclima has been actively present in italy and throughout the world since 1959 with a widespread network of agents and concessionary agents to constantly guarantee the presenc...

  • Page 5

    5 general instructions ● this booklet constitutes an integral and essential part of the product. Read carefully the instructions contained in this booklet as they provide important directions regarding the safety of installation, use and maintenance. Preserve this booklet with care for any further c...

  • Page 6

    6 description these boilers are fully automatic and gas control is effected by an electronic control unit having the following characteristics: - continuous modulation mode on both circuits; - possibility to adjust the heating output; - possibility to adjust the slow ignition; xilo t models are equi...

  • Page 7

    7 main components legend 1 fumes pressure switch 2 fan 3 heating sensor 4 total safety thermostat 5 exchanger 6 burner 7 ignition electrodes 8 control electrode 9 automatic air bleed valve 10 safety valve 11 circulator 12 filling cock 13 gas valve 14 modulating coil 15 gas pressure reading point 16 ...

  • Page 8

    8 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 600 500 400 300 200 100 prevalenza residua mbar portata (l/h) dimensions mm circulating pump features system delivery/pressure boiler version: mod. Ms type c12-c32-c42-c52-c62-c82 max. Water temperature 90 °c rated gas pressure: natural gas...

  • Page 9

    9 the boilers leave the factory calibrated and ready to operate with natural gas and liquid gas. For proper calibration, see the table below: burner pressure curves - output gas - nozzle calibration gas type natural gas (g20-20mbar) liquid gas b (g30-28/30mbar) liquid gas p (g31-37mbar) jets pressur...

  • Page 10

    10 electrical connections - wiring diagrams the boiler must be connected to an earthed, single-phase 230v-50 hz mains supply by means of a three-wire cable, ensuring that connections to the line and neutral terminals are made correctly. A bipolar switch must be used with contacts opening to at least...

  • Page 11

    11 l n j1 f j14 l1 cir j3 j4 ea j15 vn tl j6 j10 j13 j9 j8 bm jp4 jp3 rla r max. Sr ps ea ec jp1 pa 3 2 1 ta vg j12 tst control panel jumper to be cut if limit thermostat is required modula tor panel connection lock-out warning light jp5 (low temp.) on/off warning light malfunction warning light ass...

  • Page 12

    12 mulfunctions and adjustments j p 4 j p 1 j p 3 j p 5 r l a r m a x . Rla r max. On lpg - off methane on off (post-circ. Off) post-circ. Heating on 2.5 minutes on off heating timer off heating timer on 2.5 minutes jp5 jp4 jp3 jp1 resistor jumper cut, floor heating temp. Set to 30/40 c. Resistor ju...

  • Page 13

    13 water connection fit the supporting hooks and attach the assembly template, moving it up to the wall; fit all the pipes, starting with the end pipe fittings already mounted on the template: system supply, system return, cold water, hot water, any gas pipes and electric mains leads with room therm...

  • Page 14

    14 water circuit legend a system delivery b gas c cold water inlet d system return 1 exchanger 2 modulator coil 3 heating sensor 4 gas valve 5 filling cock 6 safety valve 7 no-water pressure switch 8 circulator 9 burner 10 expansion tank 11 fumes pressure switch 12 fan 13 automatic air bleed valve 1...

  • Page 15

    15 boiler installation unpacking the boiler 1 open the top of the carton and remove the following parts: boiler tools and accessory pack document pack and wall template wall mounting template down-draft diverter 2 break open the boiler carton with care. Do not cut the carton, open with a knife: you ...

  • Page 16

    16 installation to be carried out by qualified personnel. The installation must be in compliance with the stipulations of the law regarding the evacuation of combustion materials according to the regulations in force. The gas fume evacuation must be effected with a pipe of a diameter not less than t...

  • Page 17

    17 fume evacuation/air intake 1 concentric flue pipe, from the roof c32 2 concentric flue pipe, from the terrace c32 3 double flue pipe from separate flues c42 4 concentric flue pipe, connected to concentric flues c42 5 concentric flue pipe, from an external wall c12 6 double flue pipe from the terr...

  • Page 18

    18 flue exhaust installation attention: use only air intake/ fume evacuation kits produced by lamborghini caloreclima. Concentric flue pipe fit the concentric elbow pipe positioning it on the desired direction and insert on it the sealing gasket. Then fit the appropriate diaphragm (see table below)....

  • Page 19

    19 adjustments note: for this calibration it is necessary to use a water column pressure gauge connected to the pressure plug. Radjustment of outlet pressure maximum pressure: ● power the modulator with the proper voltage. ● by turning nut b clockwise (use a 10 mm wrench), the outlet pressure increa...

  • Page 20

    20 switching off prolonged switching off if the boiler should remain inactive at length close the gas cock and cut electrical power supply to the appliance. Temporary switching on/off proceed in one of the following ways: ● use the room thermostat; ● use the adjustment potentiometers (on the instrum...

  • Page 21

    21 if a room thermostat is installed we recommend our chronothermostat class piu’ which, in addition to guaranteeing the comfort of a precise regulation of temperature, offers a notable range of heating programmes; alternatively use a programming digital timer. Attention. The room thermostat with 23...

  • Page 22

    22 operation with different types of gas components for operation on liquid gas gas type natural gas (g20-20mbar) liquid gas b (g30-28/30mbar) liquid gas p (g31-37mbar) gas valve h gasket gas diaphragm gasket conversion from natural gas to liquid gas proceed with burner jets replacement, insert the ...

  • Page 23

    23 fault-finding chart 1 no ignition 2 crackling ignition 3 smell of gas 4 mell of unburnt gas and bad burner combustion 5 condensation in the boiler 6 cold radiators in winter fault cause remedy a . Gas cock closed b . Boiler locked out c . No flame detection d . No ignition spark e . Air inside pi...

  • Page 24

    24.

  • Page 25

    25.

  • Page 26

    26.

  • Page 28

    Burners wall hung and floor standing gas boilers cast iron and steel boilers warm air heaters water treatment air conditioning 07/2002 cod. 97.50536.0 lamborghini calor s.P.A. Via statale, 342 44040 dosso (ferrara) italia tel. Italia 0532/359811 - export 0532/359913 fax italia 0532/359952 - export 0...