Lantronix LFX2 Installation Manual - page 3
Installation Tips
Note:
These tips are additional to the Installation
Instructions that can be found on the back of the
unit.
▼
The RJ45 ports on the LFX2 are autosens-
ing for speed and for half/full duplex opera-
tion. When the unit is powered on, verify the
correct modes of operation by examining
the LEDs for each port. No further configu-
ration is necessary. If the correct mode of
operation does not appear in the LED dis-
play, check the cable and connecting
equipment. If changes are made, power the
unit off and then on again to reset.
▼
If the Link/Duplex LED for a port is not lit,
please check the cable being used. The
port will only be operational if the LED is
green (Good Link/Half Duplex) or yellow
(Good Link/Full Duplex).
Power Requirements
The Lantronix LFX2 is shipped with either a
120VAC (-01 version) or a 220VAC (-02 version)
power supply. Input power requirements are 15
volts at 1.0 Amps.
CAUTION:
Not for installation in air ducts or plenums or
other environmental air handling spaces.
Changes or modifications to this device not
explicitly approved by Lantronix will void the
user’s authority to operate this device.
3