Navien NCB-180NCB-210 Quick Installation Manual

Summary of NCB-180NCB-210

  • Page 1

    Quick installation guide model ncb-180/210/240 1 step 1 before installing read the installation & operation manual before installing. This product must be installed and serviced by a licensed plumber, a licensed gas fitter, or a professional service technician. Navien is not liable for any damages o...

  • Page 2

    2 gas piping connections water piping connections condensate drain connection a condensate drain pipe must be connected to the 1/2” condensate outlet fitting at the bottom of the unit and water must be poured into the exhaust connection to fill the condensate trap. The end of the 1/2” (npt) plastic ...

  • Page 3

    3 venting electrical connections external lwco connection (if required by local codes) power connection 120 vac 60 hz min. 2 amp current with proper grounding caution using abnormally high or low ac voltage may cause abnormal operation, thereby causing fire which reduces the life expectancy of this ...

  • Page 4

    4 step 3 after installing opening all the valves operating the boiler measuring the inlet gas pressure installing the front cover ensure maximum water flow after running the boiler for the first 10 minutes, turn it off and clean the cold water filter and the space heating return strainer to remove a...