Ncr 7448 workstation release 1.3 site preparation b005-0000-1201 issue d.
The product described in this book is a licensed product of ncr corporation. Ncr is a registered trademark of ncr corporation. It is the policy of ncr corporation (ncr) to improve products as new technology, components, software, and firmware become available. Ncr, therefore, reserves the right to c...
Site preparation i preface audience this is a contractual document. It contains important warnings and confers important legal rights and obligations. You are advised to read it carefully. It is the responsibility of the customer to ensure that all installation preparations are complete and in compl...
Ii site preparation fuse replacement caution: for continued protection against risk of fire, replace only with the same type and ratings of fuse. Attention: pour prévenir et vous protéger contre un risque de feu, remplacer la fusible avec une autre fusible de même type, seulement. Power supply cord ...
Site preparation iii attention: il y a danger d’explosion s’il y a remplacement incorrect de la batterie. Remplacer uniquement avec une batterie du même type ou d’un type recommandé par le constructeur. Mettre au rébut les batteries usagées conformément aux instructions du fabricant. Peripheral usag...
Iv site preparation european countries (austria, denmark, finland, germany, ireland, italy, luxembourg, netherlands, portugal, spain, sweden, united kingdom, belgium, iceland, liechtenstein, norway and switzerland): a) nach gebrauch der verkaufsstello zurückgoben b) après usage à rapporter au point ...
Site preparation v table of contents ncr 7448 site preparation ncr 7448 site preparation ncr 7448 site preparation ncr 7448 site preparation ................................ ................................ ................................ ...............................................................
Vi site preparation peripheral tray, and 2182 cash drawer .............................................. 16 configuration with 2 x 20 operator display, 80-key keyboard and 1- line numeric customer display........................................................... 17 configuration with 2 x 20 operato...
Site preparation vii c able i llustrations ................................................................................ 41 environmental requirements environmental requirements environmental requirements environmental requirements ................................ ...................................
Viii site preparation revision record issue date remarks a august 2000 first issue b december 2000 update for release 1.1 c march 2001 update for release 1.2 d december 2001 update for release 1.3.
Site preparation ix radio frequency interference statements federal communications commission (fcc) information to user this equipment has been tested and found to comply with the limits for a class a digital device, pursuant to part 15 of fcc rules. These limits are designed to provide reasonable p...
Ncr 7448 site preparation this document provides the information necessary to prepare a site to ncr specifications prior to installing an ncr 7448 workstation system. The site must be properly prepared before the system is installed, because site preparation deficiencies may be difficult to detect a...
2 site preparation typical 7448 workstation configurations the following illustrations show 7448 workstation components arranged in typical configurations. Dimensions and operating clearances are listed in the 7448 dimensions section to identify the space required by each configuration. Use the comp...
Site preparation 3 7448 workstation with 80-key conventional keyboard.
4 site preparation interpreting the model number ncr model 7448 - xx xx - xx xx class number major model code sub model code power code language code.
Site preparation 5 related site preparation data ac power and communications wiring title order number ncr ethernet communications wiring guide bst0-2118-82 ncr workstation and peripherals ac wiring guide bst0-2115-53 peripherals title order number 7140 receipt/ journal printer user’s guide b005-000...
6 site preparation how to order information products are available through several different channels. You need an order form if you are using fax, e-mail, or mail order. Order forms available to ncr personnel through quicklook. In quicklook, click on forms & templates, then select information produ...
Site preparation 7 smtp • order, management unitedk (international) mail order • ncr corporation ipp-dayton 1700 s. Paterson boulevard dayton, oh 45479 usa • ncr corporation 915 high road north finchley london n12 onh united kingdom.
8 site preparation customer responsibilities before the system can be installed, the customer must do or provide the following: • when required by ncr, provide the ncr customer services representative with appropriate drawings that indicate: • location of the equipment • site wiring (power and commu...
Site preparation 9 store wiring requirements ac wiring the customer must provide suitable ac power for the terminals, associated equipment, and devices. An ac power circuit dedicated to the ncr equipment installation is recommended. The ac outlet must be installed near the terminal and easily access...
10 site preparation system configuration diagram 7870 scanner 7875 scanner 7880 scanner 7890 scanner denso ccd scanner 7140 7194 7158 7161 7196 rs232 transaction printers rs232 scanners 1 line 10 digit numeric 4x20 char. Alphanumeric 256x64 pixel international 2x20 char. Alphanumeric rs232 customer ...
Site preparation 11 physical considerations this section presents the following workstation information: • handling instructions • operating and service clearance requirements • display mounting considerations • workstation and component dimensions • component weights • airflow requirements • power ...
12 site preparation operating and service clearance requirements service clearance requirements all units device above mm (in.) left side mm (in.) right side mm (in.) front mm (in.) behind mm (in.) all units 153 (6) 153 (6) 202 (8) - 153 operating clearance requirements device above mm (in.) left si...
Site preparation 13 workstation dimensions configuration with 2x20 operator display, 80key keyboard, 1-line numeric customer display, peripheral tray, and 2182 cash drawer.
14 site preparation configuration with mono/passive color lcd operator display, 80key keyboard, international vfd customer display with telescope mount, peripheral tray, and 2182 cash drawer.
Site preparation 15 configuration with tft color lcd operator display, 80key keyboard, international vfd customer display with telescope mount, peripheral tray, and 2182 cash drawer 457 151 450 475 535 517 227 57 18 400 437.
16 site preparation configuration with 9” crt operator display, 80key keyboard, peripheral tray, and 2182 cash drawer 598 mm 450 mm 475 mm 151 mm 465 mm 400 mm 437 mm 18 mm.
Site preparation 17 configuration with 2 x 20 operator display, 80-key keyboard and 1-line numeric customer display.
18 site preparation configuration with 2 x 20 operator display, 176-key micromotion keyboard and international vfd customer display with telescope mount.
Site preparation 19 configuration with mono/passive color lcd operator display, 80-key keyboard and international vfd customer display with telescope mount.
20 site preparation configuration with tft lcd display, 80key keyboard, international vfd customer display with telescope mount.
Site preparation 21 configuration with lcd operator display, 176-key micromotion keyboard and international vfd customer display with telescope mount.
22 site preparation configuration with tft color lcd display, 176-key micromotion keyboard and international vfd customer display with telescope mount.
Site preparation 23 component dimensions base unit with 2 x 20 operator display and 80-key conventional keyboard.
24 site preparation base unit with 10.4” mono/passive color lcd operator display with 176-key micromotion keyboard.
Site preparation 25 base unit with tft color operator lcd display and 176- key micromotion keyboard.
26 site preparation base unit with 9” crt operator display and 80-key conventional keyboard 355 mm 495 mm 372 mm.
Site preparation 27 245 mm.
28 site preparation cash drawer ncr 2260 cash drawer 15414 121 mm (4.75 in.) 457 mm (18 in.) 457 mm (18 in.) 277 mm (11 in.) operating and service clearance for drawer ncr 2189 cash drawer 16676 133 mm (5.25 in.) 330 mm (13 in.) (18.25 in.) operating and service clearance for drawer 464 mm 527 mm (2...
Site preparation 29 ncr 2182 cash drawer.
30 site preparation customer displays ncr 1-line numeric customer display integrated with telescope mount/ low profile mount ncr 4-line alpha numeric customer display integrated with telescope mount/ low profile mount x low profile mount 224 mm telescope mount 344 mm or 419 mm.
Site preparation 31 ncr international vfd customer display integrated with telescope mount/ low profile mount x low profile mount 229 mm telescope mount 349mm or 424 mm.
32 site preparation printers 7140 printer 15457 170 mm 6.7 in. 150 mm 5.9 in. 273 mm 10.75 in. 245 mm 9.65 in. 206 mm 8.12 in. 7158 printer 165 mm (6.50 in.) 336 mm (13.25 in) 229 mm (9.00 in) 305 mm (12.00 in.) 17307.
Site preparation 33 7161 printer 148 mm 165 mm 240 mm (5.5 in.) (6.5 in.) (9.45 in.) 7194 printer 16492 130 mm (5.10 in.) 157 mm (6.20 in.) 85 mm (3.30 in.) 212 mm (8.3 in.) 187 mm (7.4 in.).
34 site preparation 7196 printer 108 mm (4.25 in.) 140 m (5.50 in.) 146 mm (5.75 in.) 254 mm (10.00 in.) 17306.
Site preparation 35 component weights the following table shows the component weights for each integrated workstation component. Workstation components weight lbs. Kg. Base unit- flash disk model* 7.5 3.4 base unit- hard disk model** 7.94 3.6 2189 cash drawer 20.9 9.5 2182 cash drawer 13.7 6.23 2260...
36 site preparation *note: base unit- flash disk model, includes the lower cabinet, upper cabinet, chassis with mediagx processor board, personality board, and pcmcia expansion board, ac adapter, printer ac adapter and nicad battery. **note: base unit- hard disk model, includes the lower cabinet, up...
Site preparation 37 power requirements the 7448 workstation base unit contains 100 - 240 volt ac adapters for a printer and a workstation. The ac adapter for a workstation provides power for up to four of the peripherals. The following tables show operating specifications for the power supply. The a...
38 site preparation cable routing considerations cable connectors are located in the rear panel of the base unit. Rs232 (com 3) rs232 (com 4) rs232 (com 5) cash drawer interface pcmcia type 2 or compact flash type1 and type2 rs232 (com 1) rs232 (com 2) rs232 (com 6) usb (2 ports) ps/2 keyboard power...
Site preparation 39 system cables cable type cable name ncr part no./ corp. Id no. Approximate cable lengths drawer extension cable 230-0145735 1424-c112-0030 3 m/ 9.8 ft cash drawer dual cash drawer, y-cable 497-0409394 1416-c372-0006 0.6 m/ 25 in. U.S./canada power cord 006-1009037 1416-c325-0030 ...
40 site preparation cable type cable name ncr part no./ corp. Id no. Approximate cable lengths printer extender drop cables (7453-k641) for 7161 printer or 7194 printer 497-0411815 1416-c417-0040 4 m/ 13 ft for 7161 printer 497-0411816 1416-c418-0040 4 m/ 13 ft serial extender cable for 7194 printer...
Site preparation 41 cable illustrations 7870, 7875, or 7880 scanner/scale (rs-232) scanner to 7448 rs-232 port d-shell 9-pin receptacle modular 10-pin plug 497-0300422 7890 presentation scanner cables to 7890 scanner to 7448 workstation 497-0405826 scanner module cable 497-0410036 7890 scanner inter...
42 site preparation dual cash drawer, y-cable cash dwr. #1 cash dwr. #2 497-0409394 coin dispenser cable coin dispenser 497-0404832 - 4 m to 7448 rs-232port 9-pin d-shell receptacle 25-pin d-shell plug printer interface cables 7158, 7194, 7140 printers printer to 7448 rs-232 port 9-pin d-shell recep...
Site preparation 43 7161, 7196 printers printer 497-0407427 - 1 m 497-0407429 - 4 m 497-0407430 - 15.2 m to 7448 rs-232port 9-pin d-shell receptacle 25-pin d-shell plug ncr 7194 printer with 7453-k641 cable extender to 7448 rs-232 port 9-pin d-shell receptacle 25-pin d-shell plug 497-0411815 - 4m 14...
44 site preparation environmental requirements barometric pressure the 7448 workstation is designed to operate within the following barometric pressure conditions: maximum operating altitude: 2000 m (6560 ft) operating range of pressure: 105kpa to 79.5 kpa temperature the 7448 workstation is designe...
Site preparation 45.
Appendix a: transient protection ac power line transient protection in the process of power distribution, transient electrical energy (including, but not limited to, lightning strikes, intermittent short circuits, and switching transients) can be introduced onto power lines. Such transient energy ca...
A-2 appendix a: transient protection • upon failure, exhibit a positive indication of its failure such as a blown fuse or tripped breaker. • be listed by the accepted safety organization for the country involved (ul, csa, vde, etl, and so on) and the installation must conform to local, state, and na...
Appendix a: transient protection a-3 data line transient protection the nature of the transient phenomenon may extend to the data communication lines connected to this equipment. It is the responsibility of the customer to install and connect a data line transient suppression system to correct or pr...