Pacific Energy NEO 1.2A SERIES Installation And Operating Instructions Manual

Summary of NEO 1.2A SERIES

  • Page 1

    Installation and operating instructions safety notice if this stove is not properly installed, a house fire may result. For your safety, follow the installation instructions. Contact local building or fire officials about restrictions and installation inspection requirements in your area. Important:...

  • Page 2: Table of Contents

    Table of contents hot glass will cause burns. Do not touch glass until cooled. Never allow children to touch glass. ! Warning operator instructions rating label .............................................................................. 3 rating label location .......................................

  • Page 3: Rating Label

    Operator instructions rating label please save these instructions this manual describes the installation and operation of the pacific energy, neo 1.2 freestanding wood heater. This heater meets the 2015 u.S. Environmental protection agency's crib wood emission limits for wood heaters sold after may ...

  • Page 4: Safety

    Operator instructions safety chimney smoke and creosote formation when wood is burned slowly, it produces tar and other organic vapours, which combine with expelled moisture to form creosote. The creosote vapours condense in the relatively cool chimney flue of a slow burning fire. As a result, creos...

  • Page 5: Operation

    Operator instructions caution: never use gasoline, gasoline type lantern fuel, kerosene, charcoal lighter fluid or similar liquids to start or "freshen up" a fire in this heater. Keep all such liquids well away from the heater while it is in use. Caution: hot while in operation. Keep children, cloth...

  • Page 6

    Operator instructions lighting a fire warning: never use chemicals or any other volatile liquid to start a fire. 1. Adjust air control to “high” position (all the way to the left) and open door. 2. Place crumpled newspaper in the centre of the heater and crisscross with several pieces of dry kindlin...

  • Page 7

    Operator instructions restarting after extended or overnight burns 1. Open door and rake hot embers towards the front of the heater. Add a couple of dry, split logs on top of embers, close door. 2. Adjust air control to high and in just a few minutes, logs should begin burning. 3. After wood has cha...

  • Page 8: Maintenance Checks

    Operator instructions maintenance checks check the following parts for damage such as cracks, excessive corrosion, burned out sections and excessive warping: (see website for descriptions and more detail) some warping of the baffle is normal (up to 1/4” or .65cm). Replace if the baffle has permanent...

  • Page 9

    Operator instructions warning: only use materials and components supplied by manufacturer when doing maintenance or replacements. 4. Door gaskets - the gasket used on this unit (5/8" medium density fiberglass rope) requires only light pressure to seal. This will prolong seal life. It is important th...

  • Page 10: Troubleshooting

    Operator instructions problem cause cure glass is dirty 1. Wood is wet - use dry wood 2. Turning down air control - do not turn down until or damper too soon a) there is a good bed of coals b) the wood is charred 3. Draft too low - improper chimney height and / or diameter - chimney plugged or restr...

  • Page 11: Warranty Information

    Operator instructions warranty information pacific energy extends the following warranty coverage to the original registered purchaser of the product: ltd lifetime coverage (10 years) limited lifetime coverage is extended to the following components (parts only) porcelain finish, glass (glass for th...

  • Page 12: Installation Instructions

    Installation instructions installation instructions stove dimensions note: dimension does not include levelling legs assembly removing stove from crate 1. Carefully remove wood top and supports. 2. Remove plastic cover. 3. Using a 7/16"(12mm) wrench, remove lag bolts that secure hold down brackets t...

  • Page 13

    Installation instructions figure 4: slide panel in to place. Side panel installation 1. Carefully remove the panels from the box. 2. Loosen the panel bracket screws a little so that the bracket can move while fitting the panel into place. 3. Engage the tabs of the panel into the slots in the front m...

  • Page 14: Residential Installation

    Installation instructions residential installation warning: under no circumstances is this heater to be installed in a makeshift or "temporary" manner. It may be fired only after the following conditions have been met. • do not attempt to connect this heater to any air distribution duct. • outside c...

  • Page 15: Residential

    Installation instructions procedure 1. If a listed chimney and double-wall connector is to be connected to the stove, install all components to the chimney manufac- turer's installation requirements - (outside combustion air may be required, consult local building codes. See "combustion air" on page...

  • Page 16: Mobile Home Installation

    Installation instructions mobile home installation warning: under no circumstances is this heater to be installed in a makeshift or "temporary" manner. It may be fired only after the following conditions have been met. • do not connect this unit to a chimney flue serving another appliance. • do not ...

  • Page 17

    Installation instructions procedure: caution: the structural integrity of the mobile home floor, wall and ceiling/roof must be maintained. The services of a competent or certified installer, (certified by the wood energy technical training program (wett) - in canada, hearth education foundation (hea...

  • Page 18: Floor Protector

    Installation instructions the stove may be installed on a combustible floor provided ember protection made from a non-combustible material such as steel, ceramic tile, brick etc.Is used. - this protection must extend as follows: in canada: 18" (457 mm) on the firing side and 8" (203 mm) to the other...

  • Page 19: Optional Blower

    Installation instructions the optional blower kit (wodc.Blow) is equipped with a three prong power cord and may be installed at any time. Follow installation instructions supplied with the kit. Route power supply cord away from heater. Electrical rating: 115 volts a.C., 60hz, .5 amps. Fan output rat...

  • Page 20

    Installation instructions spark arrester rain cap certified chimney storm collar roof flashing chimney support wall thimble alternate up and out installation non-combustible floor protector hooded vent or 90 elbow turned down attach to floor for mobile homes 3" diameter air inlet with rodent screen....

  • Page 21

    Installation instructions fireclay flue liner concrete cap chimney approved through - wall installation as per local and federal codes 52" (1.32m) minimum minimum 7' (2.1m.) ceiling height 48" (1219 mm) non-combustible floor protector hooded vent or 90 elbow turned down *3" diameter air inlet with r...

  • Page 22

    Installation instructions complete brick set ..........................................................Ne12.Bric-a a 4 1/2” x 5 1/2” x 1 1/4” ............................(39 mm x 115 mm x 32 mm) b 3” x 4 1/2” x 1 1/4” ...................................(77 mm x 115 mm x 32 mm) c 9” x 4 1/2” x 1 1/4”...

  • Page 23: Replacement Parts - Neo 1.2

    Installation instructions 1............ Enamel panel set ....................... Ne12.32ppxxa (xx = color codes) 1(a) ....... Painted panel set ...................... Ne12.32pmbka 2............Door catch .......................................... Ne16.7825 3............Gasket guide/glass retainer .....

  • Page 24: Pacific

    Pacific energy fireplace products ltd. 2975 allenby rd., duncan, b.C. V9l 6v8 for technical support, please contact your retailer. Web site: http://www.Pacificenergy.Net printed in canada © 2016 copyright pacific energy fireplace products ltd reproduction, adaptation, or translation without prior wr...