Quest Engineering HI-E Dry 100 Installation, Operation And Maintenance Instructions
HI-E Dry 100
HI-E Dry 100
Installation, Operation and Maintenance Instructions
– Read and Save These Instructions –
This manual is provided to acquaint you with
the humidity control device so that installation,
operation and maintenance can proceed
successfully. Ultimate satisfaction depends
on the quality of installation and a thorough
understanding of this equipment. The humidity
control device is built around tested engineering
principles and has passed a thorough inspection
for quality of workmanship and function.
Installation, Operation and Maintenance Instructions
4201 Lien Rd.
Madison, WI 53704
Toll-Free 1-800-533-7533
www.QuestProtect.com sales@QuestProtect.com
– Read and Save These Instructions –
Specifications subject to change without notice.
TS-598
04/14
1
HI-E Dry 100:
• Controlledbyadehumidistatwithsettings
from20to80percentrelativehumidityanda
positive“on”and“off”setting.
• Containsablowerswitchthatpermits
continuousbloweroperationindependentof
dehumidification.
• Portableandprovidedwithfourcasters.
• Containsaninternalcondensatepumpcapable
ofliftingcondensate17feetand20feetof
condensatehose.
• Wiringisthroughafactoryinstalledsixfoot
powercord;115voltwithground.
• EnvironmentallyfriendlyR410Arefrigerant.
Water Removal Rates (Pints/Day)
172 pints
90˚F, 90%
129 pints
80˚F, 80%
110 pints
80˚F, 60% (AHAM)
113 pints
70˚F, 80%
83 pints
70˚F, 60%
94 pints
60˚F, 80%
64 pints
60˚F, 60%
67 pints
50˚F, 80%
25 pints
50˚F, 60%
quest
quest