Quiko QK-H300 User & Installation Manual

Manual is about: HYDRAULIC SWING GATE OPENER

Summary of QK-H300

  • Page 1

    Qk-h300 qk-h400 hydro hydraulic swing gate opener user installation manual e n g l is h.

  • Page 2

    255 50 c b a d 2 2 20 technical features qk-h300 qk-h300bc qk-h400 qk-h400bc power supply 230vac 50 hz current absorbed (a) 1,6 power absorbed (w) 300 incorporated capacitor ( m f) 10 protection level (ip) 55 opening time (sec) 19 travel (mm) 280 380 max. Thrust (n) 9400 operating temperature min ma...

  • Page 3: Pre-Installation Control

    Pre-installation control before installing the automation, you must check that the gate’s shutter: - the leaf turn freely in the hinges and without sticking in the ground - it does not swing during its movement; - is kept in axis by the special hinges; - the leaves have the proper stoppages when ope...

  • Page 4: Installation Materials

    Installation materials fig.1 hydro 300 - 400 1 – bracket to wall length 130 mm 2 – bolt m12 x 30 with nut 3 – bolt m12 x 55 with nut 4 – bracket, to be weld to the leaf, length 65 mm 5 - bushing 6 – cylinder cover 7 – manifold 8 – tie rod cover 9 – cup 10 – release valve (for emergency manual operat...

  • Page 5: Installation

    Installation 1- arrange the electric cables installation and connection according to the below fig.2 fig 2 2- unloose and remove the two screws # 11 (fig 1) that fastens the tie rod cover to the cylinder. Assemble: - the wall brackets # 1 to cylinder bracket by means of the bolt and nut # 2 - the le...

  • Page 6

    Fig 3 qk-h300 qk-h400 α = 90° α = 95°° α = 90° α = 95° b (mm) b (mm) b (mm) b (mm) a (mm) min max a (mm) min max a (mm) min max a (mm) min max 100 120 170 120 130 170 110 120 250 120 120 220 110 120 170 130 130 170 120 120 250 130 120 220 140 120 150 150 120 250 160 120 210 l max (mm) 1010 200 120 1...

  • Page 7

    Fig. 4 the opening and closing forces transmitted to the gate by the cylinder are regulated by adjusting two by pass valves. The blue valve adjusts the opening pressure. The red valve the closing pressure. + increase the actuator thrust - decrease the actuator thrust 8- after installation take away ...

  • Page 8

    10 – to release the opening and operate the leaves manually insert the release key as shown in the fig. 6 fig. 6.

  • Page 9

    A b c d e f fig 7 risk areas on hinged gates (figure 7) legend of mechanical risks caused by movement in accordance with the regulation on machinery, the following definitions are applicable: − “danger zones:” any area inside and/or near a machine where the presence of a person is a risk to his/her ...

  • Page 10

    Declaration of compliance (by the installer) the undersigned: address: in charge of the set-up, declares that the product: gate type: location: are in compliance with the essential safety requirements of the regulations: regulation 89/392ce on machinery and its subsequent amendments; emc regulation ...

  • Page 11

    Declaration of compliance (in accordance with the european regulation ue89/392 appendix iia) manufacturer: borinato f.Lli snc sede legale e stabilimento 1 via chiesa, 59 36040 san germano dei berici (vi) italia stabilimento 2 via seccalegno, 19 36040 sossano (vi) italia hereby declares, under his li...

  • Page 12

    Borinato f.Lli snc via seccalegno 19 36040 sossano (vi) italy tel + 39 0444 785513 fax +39 0444 782371 info@quiko.Biz www.Quiko.Biz.