Radwin 2000+ SERIES User Manual - 4.7.1
Manual is about: POINT TO POINT BROADBAND WIRELESS
of
276
RADWIN
2000+
Series
User
Manual
Release
4.2.40
4
‐
12
Site
Preparation
4.6
Site
Preparation
Site
Preparation
includes
‐
•
Obtaining
any
necessary
legal
and
statutory
permits
for
installation
of
radio
equipment
•
Clearing
physical
obstructions
as
far
as
possible
•
Erecting
a
mast
or
tower
if
required.
A
mast
‐
sited
ODU
or
external
antenna
typically
uses
a
pole
attached
to
the
mast.
•
Installing
a
pole
on
a
building
wall
if
required
•
Constructing
a
weather
‐
proof
cabinet
to
house
a
PoE
device
or
other
IDU
if
it
is
not
to
be
housed
indoors
•
Ensuring
availability
of
power,
typically
standard
local
AC
power
•
Ensuring
that
there
is
a
LAN
cable
in
place
from
the
user’s
switch
to
the
PoE/IDU
loca
‐
tion
4.7
Mounting
Units
4.7.1
Mounting
an
ODU,
GSU,
or
HSS
Use
a
mounting
kit
to
mount
an
ODU,
GSU,
or
HSS
on
a
wall
or
pole
as
shown
in
the
following
figures:
Figure
4
‐
9:
Mounting
Kit
Contents