Rain Bird ESP-RZ Installation Manual & Operation Manual - –
4
4
Set Watering Start Days
Watering Start Days are the calendar days or
intervals (for example, Monday, Wednesday and
Friday) on which watering is allowed.
Press
+
or
–
to select one of four available
Watering Start Day options:
a. Custom Days -To schedule watering to occur
on selected days of the week, go to 4a.
b. Odd Days - To schedule watering to occur on all
odd calendar days (1,3,5...29 etc.), go to 4b.
c. Even Days - To schedule watering to occur on
all even calendar days (2,4,6...30 etc.), go to 4c.
d. Cyclic Days - To schedule watering to occur at
intervals (every 2 days, or 3 days, etc.), go to 4d.
4a
Custom Days
Press
+
or
–
to select
then press NEXT
Z
O
N
E
T
2
W
3
TH
4
F
5
S
6
SU
7
M
1
AM
1
2
MIN
BACK
OFF
ON
NEXT
Press ON (to enable) or OFF (to disable) the
blinking Selection Day. Cursor will then advance
to the next Selection Day.
Z
O
N
E
T
2
W
3
TH
4
F
5
S
6
SU
7
M
1
AM
1
2
MIN
BACK
OFF
ON
NEXT
SELECTION
DAY
l
e
Press ON or OFF to set each subsequent day of
the week as desired.
4b
Odd Days
Press
+
or
–
to select
1 3 5 29
, , ...
then press
NEXT
Z
O
N
E
AM
1
2
MIN
1 3 5 29
, , ...
BACK
OFF
ON
NEXT
4c
Even Days
Press
+
or
–
to select
2 4 6 30
, , ...
then press
NEXT
Z
O
N
E
2 4 6 30
, , ...
AM
1
2
MIN
BACK
OFF
ON
NEXT
4d
Cyclic Days
Press
+
or
–
to select
then press NEXT
Z
O
N
E
EVERY
DAYS, STARTING
AM
1
2
MIN
M
D
Y Y Y Y
BACK
OFF
ON
NEXT