Raypak Finned Water-Tube Pool Heaters 2072B-2342B Specifications

Summary of Finned Water-Tube Pool Heaters 2072B-2342B

  • Page 1

    Project name / date 1 finned water-tube pool heaters part 1 - general 1.1 summary a. Section includes gas-fired, copper finned-tube pool heaters. B. Related sections specifier note: use as needed 1. Building services piping – division 23 21 00 2. Breeching, chimneys, and stacks (venting) – division ...

  • Page 2

    Project name / date 2 1. The pool heater(s) shall be fired with gas at a rated input of btu/hr. 2. The pool heater(s) shall be csa tested and certified with a minimum thermal efficiency of 85 percent at full fire. 3. The pool heater(s) shall be asme inspected and hlw-stamped and national board regis...

  • Page 3

    Project name / date 3 associated with constant pump operation. G. Firing mode 1. For all models, provide on-off firing control of the gas input to the pool heater. H. Pool heater diagnostics 1. Provide external led panel displaying the following pool heater status/faults: a. Power on - blue b. Call ...

  • Page 4

    Project name / date 4 l. Pool heater pump - refer to equipment schedule m. Surerack™ pool heater stacking kit 1. The pool heaters shall be stacked directly one on top of the other, without offset, to minimize footprint. 2. The stacked pool heaters shall be factory-certified to seismic zone 4 require...

  • Page 5

    Project name / date 5 3.1 installation a. Must comply with: 1. Local, state, provincial, and national codes, laws, regulations and ordinances 2. National fuel gas code, ansi z223.1/nfpa 54 – latest edition 3. National electrical code, ansi/nfpa 70 – latest edition 4. Standard for controls and safety...