#$
26
PC+SAJ Logger Multi-point Monitoring
F7-\'N$$
Connection Procedures
)*)*-U/[7&~*-*+
RS485 cable. In the same way to connect all inverters.
-*)NU/[7N&
3)Connect SAJ Logger to PC through Router.
4)Open the internal Web Server of SAJ Logger for plant and inverter monitoring.