Samlexpower PST-1500-12 Owner's manual - Powering On The Loads
36 | SAMLEX AMERICA INC.
AC Output Cable Sizing & Conductor Termination for Hard-wiring
6TFDPOEVDUPSDBCMFXJUIBUMFBTU$JOTVMBUJPOSBUJOH#BTFEPOUIFNBYJNVNPVUQVU
DVSSFOUPG"GPS145BOE"GPS145UIFNJOJNVNTJ[FPGFBDIPGUIF
DPOEVDUPSTPGUIF"$PVUQVUDBCMFTIPVMECF"8(GPSCPUIUIFJOWFSUFST5IJTJTUIF
NJOJNVNTJ[FSFDPNNFOEFEJO/&$5BCMFGPSVQUP"PWFSDVSSFOUQSPUFDUJPO'PS
åSNDPOOFDUJPOXIFOVTJOHTFUTDSFXUZQFPGUFSNJOBMTVTF*OTVMBUFE1JO5ZQFPG5FSNJOBMT
GPSUFSNJOBUJPOPGUIF-JOFBOE/FVUSBMDPOEVDUPSTBOE/PO*OTVMBUFE3JOH5ZQFPG5FSNJOBM
GPSUIF(SPVOEJOHDPOEVDUPS'PSDPOWFOJFODFUIFGPMMPXJOHUFSNJOBMTIBWFCFFOQSPWJEFE
For Line and Neutral wires:/ZMPO*OTVMBUFE$PSE&OE
5FSNJOBMTGPS"8(XJSF ........................................................................ 2 pieces
For Neutral wire:/PO*OTVMBUFE3JOH5FSNJOBMGPSTUVE ....................... 1 piece
6TFQSPQFSDSJNQJOH5PPMUPDSJNQUIFUFSNJOBMTUPUIFCBSFFOETPGUIFXJSF.BLFTVSF
UIBUUIFDPOOFDUJPOTBSFUJHIUBOEåSN1MFBTFFOTVSFUIBUUIF"$DBCMFJTBEFRVBUFMZ
DMBNQFECZUIFNFUBM4USBJO3FMJFG$MBNQ1MFBTFVTFUIFGPMMPXJOHUZQFEFTJHOBUJPOPG
"$DPSE4&4&00454504+4+&004+5PS4+50
Grounding to Earth or to other designated ground
'PSTBGFUZHSPVOEUIFNFUBMDIBTTJTPGUIFJOWFSUFSUPUIF&BSUI(SPVOEPSUPUIFPUIFS
EFTJHOBUFEHSPVOE'PSFYBNQMFJOBNPCJMF37UIFNFUBMGSBNFPGUIF37JTOPSNBMMZEFT-
JHOBUFEBTUIFOFHBUJWF%$HSPVOE"OFRVJQNFOUHSPVOEJOH-VHIBTCFFOQSPWJEFE
for grounding the metal chassis of the inverter to the appropriate ground.
8IFOVTJOHUIFJOWFSUFSJOBCVJMEJOHDPOOFDUBNN
2
PS"8(JOTVMBUFETUSBOEFE
DPQQFSXJSFGSPNUIFBCPWFFRVJQNFOUHSPVOEJOHMVHUPUIF&BSUI(SPVOEDPOOFDUJPOB
DPOOFDUJPOUIBUDPOOFDUTUPUIF(SPVOE3PEPSUPUIFXBUFSQJQFPSUPBOPUIFSDPOOFDUJPO
UIBUJTTPMJEMZCPOEFEUPUIF&BSUI(SPVOE5IFDPOOFDUJPOTNVTUCFUJHIUBHBJOTUCBSF
NFUBM6TFTUBSXBTIFSTUPQFOFUSBUFQBJOUBOEDPSSPTJPO
8IFOVTJOHUIFJOWFSUFSJOBNPCJMF37DPOOFDUBNN
2
PS"8(JOTVMBUFETUSBOEFE
copper wire from the above equipment grounding lug to the appropriate ground bus of
UIF37VTVBMMZUIFWFIJDMFDIBTTJTPSBEFEJDBUFE%$HSPVOECVT5IFDPOOFDUJPOTNVTUCF
UJHIUBHBJOTUCBSFNFUBM6TFTUBSXBTIFSTUPQFOFUSBUFQBJOUBOEDPSSPTJPO
Optional Wired Remote Control
"OPQUJPOBM8JSFE3FNPUF$POUSPM.PEFM/P3$XJUIGUNFUSFDBCMFJTBWBJM-
BCMFGPSTXJUDIJOH0/BOETXJUDIJOH0''5IFSFNPUFIBT-$%EJTQMBZTIPXJOH"$PVUQVU7
")[87"BOE1PXFS'BDUPS*UBMTPIBT-&%JOEJDBUJPOTTJNJMBSUPUIFJOEJDBUJPOTPOUIF
GSPOUQBOFMJO'JH3FBE3FNPUF$POUSPM.BOVBMGPSEFUBJMT
Powering On The Loads
"GUFSUIFJOWFSUFSJTTXJUDIFEPOJUUBLFTBåOJUFUJNFUPCFDPNFSFBEZUPEFMJWFSGVMMQPXFS
)FODFBMXBZTTXJUDIPOUIFMPBETBGUFSBGFXTFDPOETPGTXJUDIJOHPOUIFJOWFSUFS"WPJE
switching on the inverter with the load already switched on. This may prematurely trigger
the overload protection.
8IFOBMPBEJTTXJUDIFEPOJUNBZSFRVJSFJOJUJBMIJHIFSQPXFSTVSHFUPTUBSU)FODFJGNVM-
UJQMFMPBETBSFCFJOHQPXFSFEUIFZTIPVMECFTXJUDIFEPOPOFCZPOFTPUIBUUIFJOWFSUFSJT
not overloaded by the higher starting surge if all the loads are switched on at once.