Samsung AM***KN4DEH Installation Manual - page 15
15
Ins
tallation Pr
oc
edur
e
English
Step 11 Performing the drainage test
1 Do a leak test at the connection part of the flexible
hose and the drain pipe:
a Connect a general hose to the connection part of
the flexible hose of the indoor unit, and pour in
some water.
Hose
Flexible hose
Water leakage
check part
b After pouring some water, reassemble the rubber
cap on the connection part of a flexible hose of
the indoor unit and firmly tighten it with a band
to prevent leakage.
c Check the leak test at the part where the adhesive
for the flexible hose and the drain pipe is used.
CAUTION
• The leak test must be performed for at least 24 hours.
2 Check the condensed water drainage:
a Pour about 2 litres of water into the indoor unit
drain pan as shown in the picture.
b When the electric cable connection is completed
• Turn on the indoor unit and outdoor unit.
• Operate in the Cool mode.
CAUTION
• Only in the Cool mode, you can check the correct
operation of the drain pump.
When the electric cable connection has not been
completed
• Remove the control box cover of the indoor unit.
• Connect the power supply (220V, 50 Hz) to the L
and N terminals.
• Reassemble the control box cover and turn on the
indoor unit.
CAUTION
• When the float switch is not detected due to
insufficient water on the drain pan, the drain
pump will not work.
• If the power supply is directly connected to the
L and N terminals, communication error message
might appear.
• After completing the drainage check, turn the
unit off and disconnect the power supply.
• Reassemble the control box cover.
c Check whether the drain pump works correctly.
d Check whether the drainage is performing
correctly at the end of the drain pipe.
e Check for leakage at the drain pipe and drain pipe
connection part.
f When leakage occurs, check whether the indoor
unit is level and check the drain hose connection
part, drainpipe connection part and drain pump
connection.
g When the drainage check is completed and the
condensed water remains on the drain pan,
remove the water.
Step 12 Connecting the power and
communication cables
Power and communication cable connection
• Before wiring work, you must turn off all power
source.
• Connect the power and communication cable among
the units within maximum length to set the voltage
drop under 10%.
DVM360_AC_Indoor_IM_EU_Eng_EN.indb 15
2016-02-03 오전 11:14:49