TBK Vision RYK2C54 Instruction Manual - ·preparation
·Preparation
Make three or more holes in the ceiling or wall for the screws that are
to be used to secure the main unit. If embedding the input power wire
and video out cable, make a hole for these cables to be passed
through also.
·Surface unit installation
1. Releasing the dome assembly (G) by turning in counter
clockwise direction.
2.
Take out the dome body (F) and the metal holder (E).
3. Align the housing assembly (C) with the screw holes that have
been prepared, and then secure it by tightening the four screws
(D)
4. Pass the input power wire (A) and video out cable (B) through
the hole made for that purpose.
5. Replace the camera body (F) and the metal holder (E) back into
position, by securing it with the dome assembly (G) (turning in
clockwise direction).
6. Determine the lens position in accordance with the location of
the objects to be viewed, positioning it by slowing turning the
viewing hole on top of the camera body (F) (which is the round
shaped ball object).
7. Lens view may be adjusted by slowly turning the viewing hole on
top of the camera body (F).
·In-ceiling unit installation
1. Pass the input power wire (A), video out cable (B) and the
housing assembly (C) through the hole made for that purpose.
2. Align the dome assembly (D) with the screw holes that have been
prepared, and then secure it by tightening the three screws (E).
3. Determine the lens position in accordance with the location of the
objects to be viewed, positioning it by slowing turning the viewing
hole on top camera body (which is the round shaped ball object).
4.
Lens view may be adjusted by slowly turning the viewing hole on top
of the camera body.
P4