TDK-Lambda CPFE1000F SERIES Operation Manual
CPFE1000F SERIES
POWER SUPPLY
OPERATION MANUAL
1
5 June 2013
GENERAL SAFETY INSTRUCTIONS.............................................................................................................................2
1. Timing Sequence.............................................................................................................................................................4
2. Output Voltage Adjustment Range ..................................................................................................................................5
3. Ripple and Noise.............................................................................................................................................................6
4. Maximum Line Regulation .............................................................................................................................................6
5. Maximum Load Regulation ............................................................................................................................................6
6. Over Current Protection (OCP).......................................................................................................................................6
7. Over Voltage Protection (OVP).......................................................................................................................................7
8. Over Temperature Protection (OTP) ...............................................................................................................................7
9. Remote Sensing (+S, -S terminals) .................................................................................................................................7
10. ON/OFF Control ...........................................................................................................................................................8
11. Parallel Operation (CS terminal) ...................................................................................................................................9
11a. Parallel for Redundant Operation: .............................................................................................................................10
12. Series Operation.......................................................................................................................................................... 11
13. Power ON Signal (ENA terminal)...............................................................................................................................12
14. I.O.G Signal (IOG terminal) .......................................................................................................................................12
15. Auxiliary Power Supply ..............................................................................................................................................12
16. Operating Temperature Range.....................................................................................................................................12
17. Withstand Voltage .......................................................................................................................................................13
18. Insulation Resistance...................................................................................................................................................14
19. Connection Details ......................................................................................................................................................14
20. Safety Approvals .........................................................................................................................................................15
21. EMC & Immunity .......................................................................................................................................................15
22. Fault Finding ...............................................................................................................................................................15
23. Connector Locations ...................................................................................................................................................15
24. I
2
C Bus Interface .........................................................................................................................................................16
25. Mechanical Drawing ...................................................................................................................................................21
26. Baseplate Temperature Measurement Point ................................................................................................................21
27. Heat Sink Selection .....................................................................................................................................................22