Tripp Lite 3-Phase Battery Cabinet Extended-Run Owner's Manual

Manual is about: Extended-Run 3-Phase Battery Cabinet

Summary of 3-Phase Battery Cabinet Extended-Run

  • Page 1

    Copyright © 2008 tripp lite. All trademarks are the sole property of their respective owners. Owner’s manual extended-run 3-phase battery cabinet c us not suitable for mobile applications. 1 – introduction 2 – important safety instructions 3 – battery cabinet installation 3-1 preparation 3-2 transpo...

  • Page 2

    [ 2 ] 1 – introduction tripp lite’s extended-run 3-phase battery cabinets connect to smartonline 3-phase ups systems to provide long-lasting battery backup for data centers, telecommunications, networks, industrial facilities, security, emergency systems and other mission-critical applications that ...

  • Page 3

    [ 3 ] 2 – important safety instructions installation and location warnings • install the battery cabinet in a controlled indoor environment, away from moisture, temperature extremes, flammable liquids and gasses, conductive contaminants, dust and direct sunlight. • install the battery cabinet in a l...

  • Page 4

    [ 4 ] 2 – important safety instructions (continued) battery warnings • the battery cabinet does not require routine maintenance by the user. There are no user-serviceable parts inside. Only qualified, knowledgeable service personnel familiar with all required precautions should open the access panel...

  • Page 5

    [ 5 ] 3 – battery cabinet installation read section 2 – important safety instructions before installation 3-1 preparation • at your site, prepare to off-load the battery cabinet from the delivery truck and transport it to the final installation location. Consider both the packaged weight and dimensi...

  • Page 6

    [ 6 ] 3 – battery cabinet installation (continued) 3-4 internal wiring (typical) • battery cabinets use multiple 6 vdc or 12 vdc batteries connected in series to provide nominal dc voltages ranging from 240 vdc to 480 vdc. • internal cabling is sized for specific application load currents. The insul...

  • Page 7

    [ 7 ] 3 – battery cabinet installation (continued) 3-7 electrical connection • the battery cabinet should be connected to the load through a dc disconnect switch or a dc circuit breaker. This allows the battery to be disconnected from the load and charger for maintenance and/or repair. • the dc rate...

  • Page 8

    [ 8 ] 4 – operation and charging 4-1 determine charging voltages to determine the appropriate equalization (freshening) charge voltage and float charge voltage, multiply the number of batteries connected in series in the battery cabinet by the recommended charging voltage per unit. For example: a +/...

  • Page 9

    [ 9 ] 5 – maintenance the battery cabinet contains valve-regulated recombinant lead-acid (vrla) batteries, which are maintenance-free relative to the electrolyte. You cannot add water to these batteries or sample the electrolyte specific gravity. It is necessary, however, to periodically check the c...

  • Page 10

    [ 10 ] 6 – diagrams 6-1 battery cabinet diagram (4 shelves) note: all dimensions are in inches. Conduit knockouts conduit knockouts breaker mounting plate 79 4.5 4.38 15.75 6 4.5 2.25 22 8.25 24.75 16 16 16 4 11.75 5.5 40.25 30.25 6 6 34.5 17.25 side view side view front view side view side view bot...

  • Page 11

    [ 11 ] 6 – diagrams (continued) 6-2 battery cabinet diagram (3 shelves) note: all dimensions are inches. 58 front of cabinet front of cabinet breaker mounting plate conduit knockouts conduit knockouts 15.75 2.25 side view side view side view side view bottom view top view front view 3.25 4.5 4.5 30 ...

  • Page 12

    [ 12 ] 6 – diagrams (continued) 6-3 battery and breaker diagrams (240 vdc) notes: • all internal wiring is ul-listed, mtw, 125c hi-flex cable. • terminal block is ul-recognized and rated for 600 vdc. • breaker is ul-listed and rated for 150 a, 600 vdc, 25 kaic. • cabinets with breakers are shipped w...

  • Page 13

    [ 13 ] 6 – diagrams (continued) 6-4 battery and breaker diagrams (+/- 240 vdc) notes: • all internal wiring is ul-listed, mtw, 125c hi-flex cable. • terminal block is ul-recognized and rated for 600 vdc. • breaker is ul-listed and rated for 250 a, 600 vdc, 25 kaic. • cabinets with breakers are shipp...

  • Page 14

    [ 14 ] 6 – diagrams (continued) 6-5 integrated battery charger (select models) notes: • all dimensions are inches. • ac input is selectable 120/208/240 vac, 60 hz. • constant voltage output. • electronic current limiting and high voltage shutdown. • ac and dc fusing. Included ac fusing is suitable f...

  • Page 15

    [ 15 ] 7 – specifications 7-1 dimensions and floor loading battery cabinet model shelves dimensions (width x depth x height) weight floor loading bp240v99 3 32 x 30 x 58 inches (81.3 x 76.2 x 147.3 cm) 1760 lb (800 kg) 264 lb/ft 2 (1292 kg/m 2 ) bp240v120 3 32 x 30 x 58 inches (81.3 x 76.2 x 147.3 c...

  • Page 16

    [ 16 ] 8 – storage and service storage the battery cabinet must be stored in a clean, secure environment with a temperature less than 40° c (104° f) and a relative humidity less than 90% (non-condensing). Store the battery cabinet in its original shipping container if possible. Charge the batteries ...