Tripp Lite BP192V1037C-16K Owner's Manual - 1. Introduction

Manual is about: Extended-Run Single-Phase Battery Cabinet

Summary of BP192V1037C-16K

  • Page 1

    1. Introduction 2 2. Important safety instructions 3 3. Battery cabinet installation 5 3.1 preparation 5 3.2 transportation 5 3.3 mechanical check 5 3.4 internal wiring (typical) 6 3.5 preliminary electrical check 6 3.6 battery cabinet placement 6 3.7 electrical connection 7 3.8 battery charger elec...

  • Page 2: 1. Introduction

    2 1. Introduction tripp lite’s extended-run single-phase battery cabinets connect to smartonline 3-phase ups systems to provide long-lasting battery backup for data centers, telecommunications, networks, industrial facilities, security, emergency systems and other mission- critical applications that...

  • Page 3

    3 2. Important safety instructions save these instructions all sections of this manual contain instructions and warnings that must be followed during the installation and operation of the battery cabinet described in this manual. Read all instructions thoroughly before attempting to move, install or...

  • Page 4

    4 2. Important safety instructions (continued) battery warnings the battery cabinet does not require routine maintenance by the user. There are no user-serviceable parts inside. Only • qualified, knowledgeable service personnel familiar with all required precautions should open the access panels for...

  • Page 5

    5 3.1 preparation 3.2 transportation 3.3 mechanical check 3. Battery cabinet installation read section 2 – important safety instructions before installation at your site, prepare to off-load the battery cabinet from the delivery truck and transport it to the final installation location. • consider b...

  • Page 6

    6 3.4 internal wiring (typical) 3.5 preliminary electrical check 3.6 battery cabinet placement 3. Battery cabinet installation (continued) battery cabinets use multiple 12 vdc batteries connected in series to provide nominal dc voltages ranging from 192 vdc • to 240 vdc. Internal cabling is sized fo...

  • Page 7

    7 3.7 electrical connection 3.8 battery charger electrical connection (select models) 3.9 final electrical check 3. Battery cabinet installation (continued) the battery cabinet should be connected to the load through a dc disconnect switch or a dc circuit breaker. This allows the • battery to be dis...

  • Page 8

    8 additional battery strings can be daisy-chained to the ups internal battery system via a unique connector inside the ups battery compartment (figure 3.10a). A 15-ft. Bp240extndr15dl cable is required to connect the first battery cabinet to the ups system (figure 3.10b). Cabling for all additional ...

  • Page 9: 4. Operation and Charging

    9 4. Operation and charging 4.1 determine charging voltages 4.2 initial charge 4.3 operational check 4.4 acceptance test (optional) to determine the appropriate equalization (freshening) charge voltage and float charge voltage, multiply the number of batteries connected in series in the battery cabi...

  • Page 10: 5. Maintenance

    10 5. Maintenance 5.1 maintenance schedule 5.2 fuse replacement quarterly check measure individual battery unit temperature. (measure with a digital thermometer by placing the surface thermocouple on 1. The flat surface of the negative terminal—not the “l” connection surface. An infrared temperature...

  • Page 11: 6. Diagrams

    11 6.1 battery cabinet diagram (3 shelves) 6. Diagrams note: all dimensions are in inches. 28.80 6.00 32.4 6.00 3.25 4.50 4.50 4.00 3.50 10.58 13.50 2.25 15.75 60.00 13.50 13.50 15.40 8.25 11.00 16.00 ac input for battery charger breaker mounting plate 14.50 29.00 battery charger battery charger bat...

  • Page 12: 6. Diagrams

    12 shelf 2 shelf 3 shelf 1 (bottom) to fuse or breaker termination to ups positive to ups negative ul-listed breaker battery positive battery negative 6.2 battery and breaker diagrams 6. Diagrams (continued) shelf #2 shelf #2 shelf #3 ac input for battery charger to ups positive to ups negative batt...

  • Page 13: 6. Diagrams

    13 6.3 integrated battery charger (select models) 6. Diagrams (continued) 6.25 max 0.5 12.5 13.5 notes: • all dimensions are in inches. • ac input is preset with fuses for 120v 30 a, but can be rewired for 208 and 240 vac, 60 hz by a qualified electrician. • constant voltage output. • electronic cur...

  • Page 14: 7. Specifications

    14 7.1 dimensions and floor loading 7.2 recommended torque 7. Specifications battery cabinet model shelves dimensions (width x depth x height) weight floor loading bp240v557c-1ph 3 32.4 x 28.8 x 60 inches (82.3 x 73.2 x 152.4 cm) 1250 lb (567.5 kg) 193 lb/ft 2 (943 kg/m 2 ) bp240v787c-1ph 3 32.4 x 2...

  • Page 15: 9. Warranty

    15 9. Warranty 8. Storage and service storage the battery cabinet must be stored in a clean, secure environment with a temperature less than 40° c (104° f) and a relative humidity less than 90% (non-condensing). Store the battery cabinet in its original shipping container if possible. Charge the bat...

  • Page 16

    200809068 93-2847 1111 w. 35th street, chicago, il 60609 usa +1.773.869.1234 • www.Tripplite.Com.