U-Line Echelon 2075DWRRSS Installation Instructions

Other manuals for Echelon 2075DWRRSS: Supplementary Manual, User Manual, Specifications, Installation Manual
Manual is about: U-Line Echelon 2075DWRRSS: User Guide

Summary of Echelon 2075DWRRSS

  • Page 1

    Full overlay door panel installation instructions for models 2075 dwr and co2075dwr u-line corporation p.O. Box 245040 • milwaukee, wi 53224-9540 phone 414.354.0300 • fax 414.354.7905 www.U-lineservice.Com printed in u.S.A. P/n 30012.

  • Page 2: More Than 20 Lbs.

    Full overlay drawer panels completely cover the drawer frames and handle to give a built-in appearance. Table 1. Full overlay panel dimensions panel dimensions 23-3/4" wide x 14-3/4" high. See figure 1 for screw locations to mount panel to door. • the total weight of both drawer panels must not weig...

  • Page 3: Cabinet:

    Remove existing drawer front from cabinet: 1. Open drawer. Pull door gasket (figure 2) out of the groove (top edge of door only). Start in the middle and pull outward, moving toward the edge. This may take some force. 2. Remove the two screws locat- ed on both sides of the lower handle. Remove the h...

  • Page 4: Figure 5

    5. On a clean surface, place the wood panel face down and tape the existing drawer panel (removed in step 3) on the back of the wood panel (figure 4) and drill the five (5) holes (5/32" drill 3/8" deep) through the drawer panel and 3/8" into the wood panel (figure 1). Remove tape from the drawer pan...