Vailant uniSTOR Operating Instructions Manual - page 3
Operating instructions for uniSTOR 0020111106_01
3
1
Notes on the documentation
The following instructions are intended to guide you
through the entire documentation.
Further documents apply in combination with these
operating instructions.
We do not accept liability for any claims or damages
resulting from failure to observe these instructions.
1.1
Other applicable documents
> When operating the cylinder, observe all of the operating
instructions delivered with other system components.
These operating instructions are included with the indi-
vidual components of the system.
1.2 Storing
documents
> Store these operating instructions and all other appli-
cable documents in such a way that they are available
whenever required.
1.3 Symbols
used
The symbols used in the text are explained below.
i
Symbol that denotes useful tips and
information
>
Symbol for a required action
1.4
Applicability of the instructions
These instructions apply for the following only:
Unit type
Cylinder volume
Article number
VIH GB 120/2 S
120 litres
0020115403
VIH GB 155/2 S
155 litres
0020115406
VIH GB 180/2 S
180 litres
0020115409
VIH GB 210/2 S
210 litres
0020115412
VIH GB 260/2 S
260 litres
0020115415
VIH GB 310/2 S
310 litres
0020115418
Table 1.1 Applicability of the instructions
> The article number of the unit is displayed on the identi-
fication plate.
1.5
Cylinder identification plate
The identification plate is attached to the front of the
cylinder at the factory.
1.6 CE
label
CE labelling shows that, based on the type overview, the
units comply with the basic requirements of the applica-
ble directives.
– Low voltage directive (Council Directive 2006/95/EC)
– Electromagnetic compatibility directive (Council Directive
2004/108/EC)
1.7 Benchmark
i
Vaillant Ltd. supports the Benchmark Initia-
tive. You will find the Benchmark Logbook on
the last page of this instruction manual. It is
very important that this document be filled
out properly when installing, commissioning
and handing-over to the operator of the
installation. Installers should point out also
the service record section for completion fol-
lowing service calls to this appliance.
Benchmark places responsibilities on both
manufacturers and installers. The purpose is
to ensure that customers are provided with
the correct equipment for their needs, that it
is installed, commissioned and serviced in
accordance with the manufacturer’s instruc-
tions by competent persons approved at the
time by the Health and Safety Executive and
that it meets the requirements of the appro-
priate Building Regulations.
The Benchmark Checklist can be used to dem-
onstrate compliance with Building Regulations
and should be provided to the customer for
future reference.
Installers are required to carry out installa-
tion, commissioning and servicing work in
accordance with the Benchmark Code of Prac-
tice which is available from the Heating and
Hot water Industry Council who manage and
promote the Scheme.
V
isit “www.central heating.co.uk” for more
information.
Notes on the documentation 1