Vaillant TURBOmax Pro 28/2 E Instructions For Installation And Servicing

Manual is about: Wall hung room sealed fan assisted combination boilers

Summary of TURBOmax Pro 28/2 E

  • Page 1

    Supplied by www.Heating spares.Co tel. 0161 620 6677 instructions for installation and servicing turbomax pro 28/2 e wall hung room sealed fan assisted combination boilers the code of practice for the installation, commissioning & servicing of central heating systems i 0

  • Page 2: Table Of Contents

    Supplied by www.Heating spares.Co tel. 0161 620 6677 2 table of contents introduction boiler specification general requirements boiler installation sequence general information . . . . . . . . . . . . . . . . . . . . . . . . . .5 ec designation . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

  • Page 3: Table Of Contents

    Supplied by www.Heating spares.Co tel. 0161 620 6677 3 table of contents gas supply adjustments (commissioning part ii) servicing fault finding introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .57 logical fault finding procedure . . . . . . . . . . . . . . . . . .57 fault fin...

  • Page 4: List of Contents

    Supplied by www.Heating spares.Co tel. 0161 620 6677 4 list of contents contents included with boiler ensure that all contents are included before commencing installation. Do not remove the boiler from the polystrene base at this stage. Bedienungsanleitung bedienungsanleitung bedienungsanleitung bed...

  • Page 5: Introduction

    Supplied by www.Heating spares.Co tel. 0161 620 6677 5 introduction the turbomax pro is a fully automatic, wall mounted, room sealed combination boiler for central heating and domestic hot water. Domestic hot water is supplied directly from the boiler, without requiring a copper cylinder, cold water...

  • Page 6: Boiler Specification

    Supplied by www.Heating spares.Co tel. 0161 620 6677 6 boiler specification technical data turbomax pro 28/2 e ( vuw gb 282/2-3) units ch heat output range (80/60 °c) 10.4 - 28 (35 500 - 95 500) kw (btu/h) dhw heat output 28 (95 500) kw (btu/h) dhw flow rate ∆ t =35 °c rise 11.5 l/min dhw flow rate ...

  • Page 7: Boiler Specification

    Supplied by www.Heating spares.Co tel. 0161 620 6677 7 boiler specification boiler connections 0 7 6 310 592 145 6 5 100 100 35 35 4 3 2 130 180 1 148 8 5 4 3 2 1 fig. B.1: connection diameters euro b/s 024/2 key: 1 heating system return (22 mm compression) 2 cold water connection with shut off valv...

  • Page 8: Boiler Specification

    Supplied by www.Heating spares.Co tel. 0161 620 6677 8 boiler specification c c 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 16 18 19 21 22 23 24 25 26 27 28 29 30 31 functional diagram 1 air duct 2 fan 3 main heat exchanger 4 temperature sensor (ntc i) 5 flame sensing electrodes 6 modulating burner 7 ful...

  • Page 9: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 9 general requirements ensure that all regulations are observed. Fig. R.1 euro b/s 006/0_gb related documents the installation of the boiler must be in accordance with the relevant requirements of gas safety (installation and use) regulations 1998...

  • Page 10: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 10 general requirements gas supply the gas supplier should ensure the availability of an adequate supply of gas. A gas meter may only be connected to the service pipe by the supplier of gas or their contractor. An existing meter should be checked ...

  • Page 11: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 11 general requirements top outlet flue system (100 mm outside diameter) the top outlet horizontal flue system (art. No. 303 807) is suitable for installations up to 720 mm measured from the centre of the boiler flue outlet to the outside face of ...

  • Page 12: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 12 general requirements flue termination the following details refer to both flue systems. A. The terminal must be positioned such that the products of combustion can disperse freely at all times. B. In certain weather conditions a plume of water ...

  • Page 13: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 13 general requirements cupboard or compartment ventilation turbomax pro combination boilers are very high efficiency appliances. As a consequence the heat loss from the appliance casing during operation is very low. For cupboard or compartment in...

  • Page 14: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 14 general requirements guide to system requirements water circulation system detailed recommendations for the water circulation system are given in bs 6798 and bs 5449: part 1 (for small bore and micro bore central heating systems). Pipework not ...

  • Page 15: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 15 general requirements expansion vessel the 28 kw boiler incorporates a 10 litre expansion vessel which is suitable for a sealed heating system with a maximum water content of 100 litres. If the nominal capacity of the built in expansion vessel i...

  • Page 16: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 16 general requirements 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 50 100 150 200 250 300 350 400 450 500 550 600 650 700 volume flow [l/min] lift [mbar] setting ii setting i fig. R.7: pump specifications euro b/s_vc_011/0gb pu...

  • Page 17: General Requirements

    Supplied by www.Heating spares.Co tel. 0161 620 6677 17 general requirements 150 5 200 500 5 i 0 0 120 60 90 30 ° c bar 4 3 2 1 0 euro b/s 022/1 440 800 338 i 0 0 120 60 90 30 ° c bar 4 3 2 1 0 euro b/s 023/1 general preparation of boiler location clearances required mount the boiler on a flat and v...

  • Page 18: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 5 5 210 124163 03 240/242/280/282/824/828 pro/plus 60/100 07/2000 124163_03 1 3 2 18 boiler installation sequence using boiler template fix the paper template to the wall ensuring that the correct flue exit point has been identified, ensure that t...

  • Page 19: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 i 0 3 320 131 22 26,5 27 131 105 105 1 2 0 120 60 90 30 ° c bar4 3 2 1 0 euro b/s 043/1 19 boiler installation sequence fig. I.4: fitting the boiler fitting the boiler ● lift the boiler (3) up to the wall so that it is slightly above the hanging b...

  • Page 20: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 3 i 0 2 i 0 90 ° 90 ° 1 euro b/s 041/1 fig. I.5: remove of boiler casing 20 boiler installation sequence removing boiler casing ● turn both securing fasteners (1) anti-clockwise by 90° to release control panel. ● lower control panel (2). ● pull th...

  • Page 21: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 21 boiler installation sequence gas supply ● connect the 15 mm compression gas service cock (1) supplied with appliance and tighten. ● connect a gas supply pipe of not less than 15 mm diameter to the inlet of the gas service cock. ● tighten all co...

  • Page 22: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 22 boiler installation sequence cold water mains inlet and hot water outlet flush all foreign matter from the mains supply before connecting to the boiler. ● connect the cold water service valve (1) to the cold inlet water connection of the applia...

  • Page 23: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 23 boiler installation sequence central heating flow and return pipework before connecting the heating circuit to the boiler appliance, all pipework and radiators must be thoroughly flushed to remove any installation debris. ● connect the central ...

  • Page 24: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 24 boiler installation sequence electrical installation general requirements all electrical work shall be carried out by a competent person and shall comply with bs7671 (iee regulations). The boiler is supplied for connection to 230 v, ~ 50 hz sup...

  • Page 25: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 25 boiler installation sequence caution mains connection terminals l and n remain live even when the boiler on/off control is switched off. ● refit the terminal box cover by pushing into place until it clips back into position. ● raise the control...

  • Page 26: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 26 boiler installation sequence euro b/s 048/1 socket x2 for internal unit components socket x4 for minority reversing valve socket x7 for accessory box connection socket x8 for vrc-vc connection room thermostat, 230 v: connections 3, 4 and 5 sock...

  • Page 27: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 27 boiler installation sequence controls external electrical controls the boiler terminals 3, 4 and 5 are for connecting external electrical controls such as a time switch and/or room thermostat. Terminals 3 and 4 are linked together when the boil...

  • Page 28: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 28 boiler installation sequence for optimum fuel economy it is recommended that where trv’s are used they are used in conjunction with a programmable room thermostat or separate timer and room thermostat to ensure complete boiler shut down when th...

  • Page 29: Boiler Installation Sequence

    Supplied by www.Heating spares.Co tel. 0161 620 6677 29 boiler installation sequence fit boiler casing ● carefully push case (1) onto the boiler such that the locating points either side at the top of the boiler engage. Push the casing onto the securing clips at the bottom of the boiler. ● close con...

  • Page 30: Commissioning Part I

    Supplied by www.Heating spares.Co tel. 0161 620 6677 30 commissioning part i preliminary electrical checks check the electrical installation by carrying out short circuit, earth continuity and resistance to earth tests and a check for correct polarity. Gas supply the complete gas installation includ...

  • Page 31: Commissioning Part I

    Supplied by www.Heating spares.Co tel. 0161 620 6677 31 commissioning part i.

  • Page 32: Commissioning Part I

    Supplied by www.Heating spares.Co tel. 0161 620 6677 32 commissioning part i 2 5 3 4 fig. Com. 1: draining the heating system eor b/s 207/0gb_pro.

  • Page 33: Commissioning Part I

    Supplied by www.Heating spares.Co tel. 0161 620 6677 33 commissioning part i initial system flush („cold“) the whole of the heating system must be flushed out at least twice: once cold, and once hot as instructed later on page 41. Open all radiator or heating valves and the boiler ch service valves ...

  • Page 34: Gas Supply Adjustments

    Supplied by www.Heating spares.Co tel. 0161 620 6677 34 gas supply adjustments (commissioning part ii) 1 2 euro b/s 034/0 gas inlet working pressure to check the gas inlet working pressu- re: ● lower the front panel of the boiler. ● lower the control panel. ● slacken the sealing screw (1) located at...

  • Page 35: Gas Supply Adjustments

    Supplied by www.Heating spares.Co tel. 0161 620 6677 35 gas supply adjustments (commissioning part ii) 1a 1 3 2 3a 2a euro b/s 035/0 main burner pressure ● the burner pressure on this appliance has been factory set and does not require adjustment. To check the main burner pressure connect the u-gaug...

  • Page 36: Gas Supply Adjustments

    Supplied by www.Heating spares.Co tel. 0161 620 6677 36 gas supply adjustments (commissioning part ii) adjusting the central heating output (range rating) the turbomax pro is fully modulating for central heating, and it is therefore not necessary to range rate the boiler. However, if desired, it is ...

  • Page 37: Gas Supply Adjustments

    Supplied by www.Heating spares.Co tel. 0161 620 6677 37 gas supply adjustments (commissioning part ii) 1) 15 °c, 1013 mbar, dry 2) the nozzles are stamped with the values shown in this table. The marking corresponds to the nozzle hole diameter multiplied by 100. 3) 1ignition rate 1) 15 °c, 1013 mbar...

  • Page 38: Functional Checks

    Supplied by www.Heating spares.Co tel. 0161 620 6677 38 functional checks (commissioning part iii) i 0 functional checks procedure once the unit has been installed and the gas supply has been checked, operate the system to ensure that it is working correctly. ● operate the system, following the oper...

  • Page 39: Functional Checks

    Supplied by www.Heating spares.Co tel. 0161 620 6677 39 functional checks (commissioning part iii) operation the vaillant turbomax pro is equipped with a set of diagnostic indicator lights to show the operational status of the boiler. A functional check of dhw and ch operation can be made using thes...

  • Page 40: Functional Checks

    Supplied by www.Heating spares.Co tel. 0161 620 6677 40 functional checks (commissioning part iii) heating system ● ensure that the power on indicator is illuminated (1). ● ensure that the maximum radiator temperature control is turned to the high position. ● ensure external controls are calling for...

  • Page 41: Functional Checks

    Supplied by www.Heating spares.Co tel. 0161 620 6677 41 functional checks (commissioning part iii) adjusting pump speed the unit is fitted with a two-speed pump. The pump is delivered with the switch (1) set to position ii. Important note: the boiler should only be operated at pump setting ii becaus...

  • Page 42: Functional Checks

    Supplied by www.Heating spares.Co tel. 0161 620 6677 42 functional checks (commissioning part iii) set the maximum radiator temperature control to the desired setting. Set the maximum hot water temperature control to the desired setting. Instruct the user in the safe and efficient operation of the b...

  • Page 43: Servicing

    Supplied by www.Heating spares.Co tel. 0161 620 6677 servicing 43 before commencing any servicing or maintenance work, carry out an initial inspection of the system as follows: ● inspect the flue, pipework and electrical connections for indications of damage or deterioration. ● inspect the air suppl...

  • Page 44: Servicing

    Supplied by www.Heating spares.Co tel. 0161 620 6677 44 servicing cleaning the burner and primary heat exchanger ● turn off the boiler. ● isolate the electrical supply to the boiler. ● remove the boiler case as described on page 20. ● turn off the gas service valve. ● turn off the boiler ch service ...

  • Page 45: Parts Replacement

    Supplied by www.Heating spares.Co tel. 0161 620 6677 45 parts replacement ensure that all regulations are observed. Fig. E.1: general euro b/s 006/0gb safety instructions the following safety instructions are to be followed when installing replacement parts! Important: before starting any maintenanc...

  • Page 46: Electrodes

    Supplied by www.Heating spares.Co tel. 0161 620 6677 46 1 3 4 5 2 euro b/s 158/1 electrodes ● refer to the important information and initial preparation on page 45. ● remove combustion chamber cover by unclipping the three clamps. ● unclip the terminal box cover. ● disconnect both ht leads (3, 4) fr...

  • Page 47: Parts Replacement

    Supplied by www.Heating spares.Co tel. 0161 620 6677 47 parts replacement 1 2 4 3 8 9 5 7 6 fig. E.4: fan euro b/s 162/0 fan ● refer to the important information and initial preparation on page 45. ● remove combustion chamber cover by unclipping the three clamps (1). ● remove the screw (3) and push ...

  • Page 48: Parts Replacement

    Supplied by www.Heating spares.Co tel. 0161 620 6677 48 3 1 2 6 5 7 4 eur o b/s 29 7/0 9 10 8 13 14 11 12 eur o b/s 298/0 parts replacement fig. E.5a: gas valve fig. E.5b: gas valve gas valve ● refer to the important information and initial preparation on page 45. ● loosen screw and pull electrical ...

  • Page 49: Parts Replacement

    Supplied by www.Heating spares.Co tel. 0161 620 6677 49 parts replacement temperature sensors (ntc’s) ● refer to the important information and initial preparation on page 45. ● identify which sensor(s) is to be replaced. ● if required remove combustion chamber cover by unclipping the three clamps. ●...

  • Page 50: Parts Replacement

    Supplied by www.Heating spares.Co tel. 0161 620 6677 50 parts replacement 1 4 2 3 fig. E.8: expansion vessel euro b/s 164/0 expansion vessel please note: in the unlikely event of a failure of the ch expansion vessel follow procedure depending upon the installation circumstances. Boiler installed wit...

  • Page 51: Parts Replacement

    Supplied by www.Heating spares.Co tel. 0161 620 6677 51 parts replacement electronic control board ● refer to the important information and initial preparation on page 45. ● lower control box. ● unclip the terminal box cover by releasing the cover retaining clips and lift to remove. ● unclip the ele...

  • Page 52: Air Pressure Switch

    Supplied by www.Heating spares.Co tel. 0161 620 6677 52 air pressure switch ● refer to the important information and initial preparation on page 45. ● remove clips (6) and lift out pressure switch (7). ● disconnect electrical connections (4). ● disconnect air tubes (5). ● re-assemble in reverse orde...

  • Page 53: System Bypass

    Supplied by www.Heating spares.Co tel. 0161 620 6677 53 system bypass ● refer to the important information and initial preparation on page 45. ● release central heating water pressure. ● remove spring clip (2) ● undo union (1), remove bypass/connecting pipe. ● pull apart bypass and connecting pipe. ...

  • Page 54: Parts Replacement

    Supplied by www.Heating spares.Co tel. 0161 620 6677 54 parts replacement 2 2 1 fig. E.15: pressure gauge euro b/s171/0 1 4 6 3 5 fig. E.16: aqua sensor euro b/s 172/0gb_pro pressure gauge ● refer to the important information and initial preparation on page 45. ● release central heating water pressu...

  • Page 55: Parts Replacement

    Supplied by www.Heating spares.Co tel. 0161 620 6677 55 parts replacement dhw heat exchanger ● refer to the important information and initial preparation on page 45. ● release central heating water pressure. ● remove the diverter valve and pump as previously described. ● disconnect wire from the ntc...

  • Page 56: Checking Functions

    Supplied by www.Heating spares.Co tel. 0161 620 6677 56 i 0 fig. E.19: functional check euro b/s 058/0 checking functions procedure on completion operate the system run to ensure that the boiler is working correctly. ● operate the system, following the operating instructions supplied with the boiler...

  • Page 57: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 57 fault finding flame indicator (yellow) illuminates when flame is recognised by the flame monitoring system. (a flashing indicator shows that an ntc sensor is broken, not connected or shorted to earth.) burner lockout indicator (red) illuminates...

  • Page 58: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 58 fault finding ensure boiler main on/off control is set to position "1" ye s go to sheet c check electrical supply , appliance fuses and on/of f control no is 230v ac present across ter minals l and n? Ye s is 230v ac present across ter minals 3...

  • Page 59: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 59 fault finding sheet b check operation of pump and fan tur n off the main on/off control to the "0" position diconnect the power supply to the boiler go to sheet a check transfor mer 230 v ac primar y (black/red) and approx. 17 vdc secondar y (b...

  • Page 60: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 60 fault finding check central heating and controls ensure that radiator temperature control knob is set to ver tical position and that any inter nal timer (if fitted) is calling for heat no is 230 v ac present across ter minals 4 and 5 no exter n...

  • Page 61: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 61 fault finding does fan run after approx. 30 secs.? Check flue and ignition system no check pitot tube (in fan outlet) and air hoses are not obstructed and correctly aligned. Check or replace air pressure switch. Does the fan run now? Is 230 v a...

  • Page 62: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 62 fault finding check gas valve and central heating system pressure does bur ner light 1st attempt? Does bur ner light within 3 ignition attempts? No ye s check gas supply does bur ner light? Ye s check bur ner pressure settings are correct ye s ...

  • Page 63: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 63 fault finding does flame indicator glow and flames increase in size to full gas rate after approx. 2 mins? Ye s does bur ner flame modulate/ go out when radiator temperature control is tur ned left to the horizontal position at flow temperature...

  • Page 64: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 64 fault finding draw hot water at high rate ye s check hot water flow rate and temperature. Compare with technical data, if flow is not sufficient check incoming main and cold water filter . Nor mal operation carr y out electrical safety checks n...

  • Page 65: Fault Finding

    Supplied by www.Heating spares.Co tel. 0161 620 6677 65 fault finding.

  • Page 66: Diagrams

    Supplied by www.Heating spares.Co tel. 0161 620 6677 66 diagrams power supply f2a l 2 n 1 main switch main transformer 230v 20v air pressure switch fan pump ntc flow temperature sensor flame sensor gas valve aqua sensor f1,25a ntc return temperature sensor burner lock out indicator (red) hot water d...

  • Page 67: Diagrams

    Supplied by www.Heating spares.Co tel. 0161 620 6677 67 diagrams switchgear cabinet u100 x3 t 2 = f2 t 1,25 = f3 x2 x2 x1 24 23 1 12 13 14 15 16 17 18 19 20 21 22 2 3 4 5 6 7 8 9 10 11 x6 diagnosis x2 aqua sensor pressure sensor ntc retur n ntc ear th ionisation electrode bridge ntc flow ntc flow li...

  • Page 68: Short Parts List

    Supplied by www.Heating spares.Co tel. 0161 620 6677 68 short parts list description part no. Key no. Burner, natural gas burner chamber group: 031501 distributor tube: 126753 er.1 ignition electrode flame sensing electrode 090724 er.2 fan 190215 er.3 gas valve lpg: 053463 natural gas: 053462 er.4 f...

  • Page 69: Short Parts List

    Supplied by www.Heating spares.Co tel. 0161 620 6677 69 short parts list er.1 er.3 er.4 er.6 er.7 er.8 er.9 er.10 er.11 er.12 euro b/s 143/0 euro b/s 148/0 euro b/s 147/0 euro b/s 146/0 euro b/s 156/0 euro b/s 152/0 euro b/s 154/0 euro b/s 144/0 euro b/s 151/0 eur o b/s 1 53/0 er.2 er.5 euro b/s 142...

  • Page 70: Short Parts List

    Supplied by www.Heating spares.Co tel. 0161 620 6677 70 short parts list er.13 er.14 er.17 er.15 euro b/s 149/0 euro b/s 145/0 euro b/s 178/0 euro b/s 150/0 er.16 euro b/s 155/1.

  • Page 71

    Supplied by www.Heating spares.Co tel. 0161 620 6677 71.

  • Page 72

    Supplied by www.Heating spares.Co tel. 0161 620 6677 83 41 11 gb 11 · 02/2002 mü · printed on 100 % recycled paper · subject to alteration head office vaillant ltd., vaillant house, medway city estate, trident close, rochester, kent me 2 4 ez service solutions 0870 6060 777 technical advice 01634 29...