Vent-Axia CSH12 Installation & Operating Instructions

Summary of CSH12

  • Page 1

    The installation must be carried out by trained personnel. A means for disconnection must be incorporated in the fi xed wiring by a double pole switch with a contact separation of a minimum of 3mm and in accordance with the current iee wiring regulations. The heater must not be installed immediately...

  • Page 2: Installation Instructions

    Warning - this appliance must be earthed. Suggested fixings installation instructions preparation the heater will arrive separately from its storage bricks, the following bricks will be required. Csh12 & csh12a - 8 bricks csh18 & csh18a - 12 bricks csh24 & csh24a - 16 bricks only heat resisting cabl...

  • Page 3

    7. 8. Remove the front panel by removing the two self tapping screws along its bottom edge. With hands positioned on each side of the panel, lift upwards to unhook the top edge whilst pressing down on the top panel with your thumbs. Ensure the convector element is not damaged when placing this panel...

  • Page 4: Operating Instructions

    Operating instructions operation your csh(a) heater combines the economy of a storage heater with the convenience of a convector heater. The storage heater takes in energy, when electricity tariffs are low and dissipates it when tariffs are normal. The convector heater provides an instant boost on d...