Vents VUE2 250 P EC User manual - page 5
5
INTRODUCTION
USE
DELIVERY SET
Unit
-
1
item.;
User’s manual
- 1 item.;
Packing box
- 1 item.;
Control panel
- 1 item.;
The present user’s manual consisting of the technical details, operating instructions and technical
specifi cation applies to the installation and mounting the VU__2 250 P EC heat (energy / heat and
energy) recovery air-handling unit (hereinafter «Unit»).
Due to the ability to reduce heat/energy losses by means of recycling heat (energy / heat and
energy) recovery air-handling units have become an important element of energy-effi
cient spaces.
Being a component unit, the air-handling unit may not be commissioned for standalone operation.
The unit is designed to ensure continuous mechanical air exchange in houses, offi
ces, hotels,
cafes, conference halls and other utility and public spaces as well as to recover the heat energy
contained in the air extracted from the premises to warm up the fi ltered stream of supply air.
The unit is designed for extended periods of continuous operation without disconnection from
the power mains.
The transported air must not contain fl ammable or explosive mixtures, chemically active vapours,
coarse dust, soot, fats or environments favourable for the formation of hazardous substances (toxic
substances, dust, pathogenic germs), sticky substances and fi brous materials.
THE UNIT IS NOT INTENDED FOR OPERATION BY CHILDREN OR PERSONS
WITH REDUCED PHYSICAL, MENTAL OR SENSORY CAPACITIES, OR LACKING THE
APPROPRIATE TRAINING.
THE UNIT MUST BE HANDLED ONLY BY PROPERLY QUALIFIED PERSONNEL
AFTER THE APPROPRIATE BRIEFING.
THE CHOICE OF UNIT INSTALLATION LOCATION MUST PREVENT
UNAUTHORIZED ACCESS BY UNATTENDED CHILDREN.