Ventura PV500-27A Installation And Maintenance Manual

Summary of PV500-27A

  • Page 1

    Pv500-27a 07/04 1 installation & maintenance manual for ventura ® low nox water heater typical construction figure 27a-1 1. Vent stack * 6. Drain 2. Burner 7. Control switch(es) and fuse(s) 3. Temperature limiting device (set at 200°f) 8. Handhole cleanout 4. Operating thermostat (set at 120°f) 9. C...

  • Page 2: Ventura

    Pv500-27a 07/04 2 ventura ® low nox water heater start-up procedures caution: do not relight pilot or start burner with combustion chamber full of gas vapor, or with very hot combustion chamber. 1. Study the installation & maintenance manual for the burner carefully. 2. Fill the water heater tank wi...

  • Page 3: Ventura

    Pv500-27a 07/04 3 ventura ® low nox water heater maintenance and safety inspections 1. Establish a preventive maintenance program to assure a longer water heater life. 2. The tank should be flushed at two- or three- month intervals depending on water conditions in your location. To flush, turn off e...

  • Page 4: Ventura

    Pv500-27a 07/04 4 ventura ® low nox water heater maintenance and safety inspections (cont'd) periodic inspection of operation components (cont'd) caution: the relief valve is a primary safety device. 2. The temperature and pressure relief valve may be checked by slowly lifting the seat lever on top ...

  • Page 5

    Pv500-27a 07/04 5 maintenance & safety inspection report date burner inspection combustion analysis tank inspection tank flush & cleanout tank fitting inspection vent inspection thermostat inspection gas train leak test recommended inspection intervals yearly 6 months 6 months 3 months 6 months year...