3A.6.4 AIR RELEASE POINTS
These must be positioned at the highest points in
the system where air is likely to be trapped. They
should be used to expel trapped air and allow
complete filling of the system.
3A.6.5 EXPANSION VESSEL
The appliance has an integral expansion vessel
to accommodate the increased volume of water
when the system is heated. It can accept up to 10
litres of expansion from within the system,
generally this is sufficient, however if the system
has an unusually high water content, it may be
necessary to provide additional expansion
capacity.
3A.6.6 FILLING POINT
A method for initial filling of the system and
replacing water lost during servicing etc. has
been provided. You should ensure this method of
filling complies with the local water authority
regulations.
3A.6.7 LOW PRESSURE SEALED SYSTEM
An alternative method of filling the system would
be from an independent make-up vessel or tank
mounted in a position at least 1 metre above the
highest point in the system and at least 5 metres
above the boiler (fig. 5).
The cold feed from the make-up vessel or tank
must be fitted with an approved non-return valve
and stopcock for isolation purposes. The feed
pipe should be connected to the return pipe as
close to the boiler as possible.
3A.6.8 FREQUENT FILLING
Frequent filling or venting of the system may be
indicative of a leak. Care should be taken during
the installation of the appliance to ensure all
aspects of the system are capable of withstanding
pressures up to at least 3 bar.
3A.7
ELECTRICAL SUPPLY
The appliance is supplied for operation on 230V
@ 50Hz electrical supply; it must be protected
with a 3-amp fuse. The method of connection to
the mains electricity supply must allow for
complete isolation from the supply. The preferred
method is by using a double-pole switch with a
contact separation of at least 3 mm. The switch
must only supply the appliance and its
corresponding controls, i.e. time clock, room
thermostat, etc.
3A.8
SHOWERS
If the appliance is intended for use with a shower,
the shower must be thermostatically controlled
and be suitable for use with combination boiler.
3A.9
MOUNTING ON A COMBUSTIBLE SURFACE
If the appliance is to be fitted on a wall of
combustible material, a sheet of fireproof material
must protect the wall.
3A.10 TIMBER FRAMED BUILDINGS
If the appliance is to be fitted in a timber framed
building, it should be fitted in accordance with I.S.
813 and local Building Regulations.
The Institute of Gas Engineers publication (IGE/
UP/7) ‘Guide for Gas Installations in Timber Frame
Buildings’ gives specific advice on this type of
installation.
3A.11 CONDENSATE DISPOSAL
When choosing a location for the boiler,
consideration should be given to the disposal of
the condensate discharge into a suitable drain
or soil pipe. The condensate outlet pipe must be
connected to the drain in accordance with
building regulations or other rules in force.
3A.12 DECLARATION OF CONFORMITY
A Declaration of Conformity (as defined in I.S.
813) must be provided on completion of the
installation.
A copy of the declaration must be given to the
responsible person and also to the gas supplier
if required.