6.6 SAFETY VALVE (fig. 23)
Carry out component removal procedure as described in 6.4.
Disconnect the outlet pipe
(A)
from the safety valve, remove safety
valve locking pin
(B)
from the hydraulic manifold. Replace in the
reverse order.
6.7 BOTTOM AUTOMATIC AIR RELEASE VALVES (fig. 22)
Carry out component removal procedure as described in 6.4.
Remove the expansion pipe locking pin
(D)
from the pump assem-
bly and remove the expansion pipe. Locate and remove the AAV
locking pin
(G)
from the pump assembly and remove the AAV
assembly
(H)
. Replace in the reverse order.
6.7.1 TOP AAV (fig. 24)
Carry out component removal procedure as described in 6.4.
Remove the locking pin
(A)
. Unscrew the top AAV
(B)
. Replace in
the reverse order.
6.8 WATER PRESSURE SENSOR AND GAUGE (fig. 23)
Carry out component removal procedure as described in 6.4.
Locate and remove the locking pin
(C)
from the water pressure gauge
assembly
(D)
. Remove the wiring. Carefully withdraw the assembly.
Replace in the reverse order.
Carry out component removal procedure as described in 6.4.
Locate and remove the locking pin
(E)
from the water pressure sensor
assembly
(F)
. Remove the wiring. Carefully withdraw the assembly.
Replace in the reverse order.
6.9 PRIMARY THERMISTOR (fig. 1)
Carry out component removal procedure as described in 6.4.
Unclip and remove the air chamber front cover. Unclip the primary
thermistor from the flow outlet pipe. Disconnect thermistor electrical plug.
Replace in the reverse order.
6.10 RETURN THERMISTOR (fig. 1)
Carry out component removal procedure as described in 6.4.
Unclip and remove the air chamber front cover. Unclip the return thermistor
from the return inlet pipe. Disconnect thermistor electrical plug.
Replace in the reverse order.
6.11 PRINTED CIRCUIT BOARD (fig. 25)
Carry out component removal procedure as described in 6.4.
Lift the control fascia upward and rotate it.
Locate and remove the screws
(A)
which secure the PCB cover,
push the clips
(B)
and remove cover, after carefully taking note of
all wiring connections, disconnect all wiring from the PCB, locate
and remove the PCB securing screws, remove the required PCB.
Replace in the reverse order.
6.12 GAS VALVE (fig. 14 & 26)
Carry out component removal procedure as described in 6.4.
The gas valve must be changed as complete unit. Disconnect the
electrical plug and leads from the gas valve, lacken and unscrew
gas valve inlet (gas cock
, fig. 14)
and outlet
(A, fig. 26)
connections.
Please note,
the sealing washers
(B)
must be discarded and
replaced with new sealing washers. Disconnect the compensation
pipe
(C)
. Locate and remove gas valve retaining screws
(D)
on the
underside of the boiler if required, the gas valve can now be
removed. Replace in the reverse order. Check and adjust burner
pressure settings.
WARNING, A GAS TIGHTNESS CHECK MUST BE CARRIED
OUT.
6.12.1 INJECTOR (fig. 26)
Carry out component removal procedure as described in 6.4.
Unscrew and remove gas pipe connections
(A & E)
. Locate and
remove the injector
(F)
inside the pipe. Replace in the reverse order.
Check and adjust burner pressure settings.
WARNING, A GAS TIGHTNESS CHECK MUST BE CARRIED
OUT.