VOKERA Mynute User Instructions - page 4
3
Mynute
1.1
GAS APPLIANCES
Gas Safety (Installations and Use) Regulations.
In the interests of your safety and that of others it
is a legal requirement that all gas appliances are
installed and correctly maintained by a competent
person and in accordance with the latest regula-
tions.
1.2
ELECTRICAL SUPPLY
Please ensure that this appliance has been prop-
erly connected to the electrical supply by means of
a double pole isolator or un-switched socket, and
that the correct size of fuse (3 amp) has been
fitted.
Warning: This appliance must be earthed!
1.3
GUARANTEE REGISTRATION CARD
Please take the time to fill out your guarantee
registration card. The completed warranty card
should be posted within 30 days of installation.
1.4
BENCHMARK LOG BOOK
The
Benchmark Log Book is supplied with your
boiler. This important document must be completed
during the installation/commissioning of your boiler.
All CORGI Registered Installers carry a CORGI ID
card and have a registration number. Both shoulf be
recorded in your
Benchmark Log Book. You can
check your installer by calling CORGI direct on
01256 372300. Failure to install and commission the
appliance in accordance with the manufacturers
instructions may invalidate the warranty. This does
not affect your statutory rights.
1.5
HOW DOES IT WORK?
Your Mynute boiler is a central heating boiler,
which supplies heated water to your radiators and
hot water cylinder.
It is controlled by the time clock or programmer
and any thermostats that your installer may have
fitted.
The Mynute lights electronically and does not
have a pilot light.
In the unlikely event of a fault developing with your
boiler, the supply of gas to the burner will be
terminated automatically.
THINGS YOU SHOULD KNOW
1.6 DIMENSIONS
HEIGHT
740mm
WIDTH
366mm
DEPTH
315mm
1.7 CLEARANCES REQUIRED
ABOVE
150mm
BELOW
150mm
SIDES
12mm
FRONT
600mm