Wacker Neuson BH 22 Operator's Manual - Operation
Manual is about: Petrol-breaker
of
34
Operation
T01120GB.fm
22
6.5
Notes for correct working procedure
6.5.1
Set the petrol breaker with its tool against the material to be worked on
and start work by pressing down throttle.
6.5.2
Make use of the weight of the petrol breaker when working.
6.5.3
The performance of the tool is not improved by applying great pressure
against the material to be worked on.
6.5.4
A certain amount of pressure on the handles is necessary in order to
avoid no-load strokes and to ensure easy and agreeable handling.
6.5.5
Position the chisel in such a way as to be able to split off the material
to be worked on. This will prevent the tool from jamming, while
simultaneously improving the overall demolition efficiency.