Wacker Neuson PT 2 Operator's Manual - Maintenance
Maintenance
PT 3 / PT 3A / PT 3H
32
wc_tx001776gb.fm
5
Maintenance
5.1
Maintaining the Emission Control System
Normal maintenance, replacement, or repair of emission control
devices and systems may be performed by any repair establishment
or individual; however, warranty repairs must be performed by a
dealer/service center authorized by WACKER NEUSON. The use of
service parts that are not equivalent in performance and durability to
authorized parts may impair the effectiveness of the emission control
system and may have a bearing on the outcome of a warranty claim.
5.2
Periodic Maintenance Schedule
The chart below lists basic machine and engine maintenance. Refer to
your engine operator’s manual for additional information on engine
maintenance.
Pump
Daily
before
start-
ing
After
first
20 hrs.
Every
50
hrs.
Every
100
hrs.
Every
300
hrs.
Check external hardware.
Inspect for leaks between pump and
engine.
Remove cover and clean sediment out
of pump housing.
Check housing cover O-rings.
Inspect shockmounts for damage.