Warmington EG SN 1250 Installation Manual - page 7
14 June 2016
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm
7
Your Fire must be Installed and Tested by a suitably qualified Gasfitter prior to use.
To light :
Lower the control-cover by pulling it outwards.
Depress the Ignition Switch and hold in the 'PILOT' position for 3-5 seconds. (This may take some time for the Gas to come
through to the Pilot-3 Flame)
Strike the Igniter by turning to the 'STAR' position, maintaining the Switch in a Depressed State ; (repeat steps 2 & 3 if necessary)
Once the Pilot Flame is lit, hold this position for 3-5 seconds , release from the Depressed State before setting the Flame Control
to Full, it may take 3-5 seconds for the Burner to Light.
Once the Flame Bed is established, set the Flame Control to the desired level & close cover.
To shut down :
Open control cover by pulling it outwards.
Turn control switch to 'PILOT'. Flame bed will extinguish.
Pilot light may be left running or extinguished by switching to 'OFF' before closing cover.
OPERATION OF YOUR WARMINGTON GAS CONVECTION FIRE (SG ONLY)
Optional:
Seismic Restraint
Secure Burner through 4X anchor points
provided on Burner Side Plate Bases
OPTIONAL: BURNER RESTRIANTS.