Warmington SI 1100 Double Flue Installation Instructions Manual - page 11
1 September 2016
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm………...Copyright on all products ©
11
Bottom Back Panel
Top Back Panel
Diagram
1:1
Step 1 :
Assemble Top & Bottom Back Panel
together by Riveting together at the
centre as shown in diagram 1:1 .
The Top Back Panel has a double
Shield layer at the Top .
Step 4 :
Assemble Top Caps to Heatshield & secure
in place with rivets as shown in diagram 4:1
Step 3 :
Install Firebox etc & assemble Front
Panel to Heatshield as shown in dia-
gram 3:1 & secure in place by rivet-
ing as shown in 3:1
Diagram
3:2
Front Panel
Diagram
3:1
Front Panel
Diagram
2:1
Side
Panel
(No
wings)
Side
Panel
(No
wings)
20mm Air Gap at
Bottom of Bottom
Back Panel for Caitec
Air Venting.
Top
Flange
Diagram
4:1
Cap
Cap
HEAT SHIELD ASSEMBLY - FOR INSTALLATION INTO FRAMING & MASONRY (NO FASCIA KIT)
Frameout Clearances
Firebox
V
W
SI 440
825
820
SI 600
825
820
SI 700
825
1000
SI 700T
875
1000
SI 780
825
1000
SI 780T
905
1000
SI 900
975
1100
SI 1100
1025
1350
Heat Shield
(No Fascia Kit)
NO FASCIA KIT INSTALLATION
Must be Constructed of
Non Combustible Material eg :
* Stone
* Concrete
* Hebel
* Blocks
Heat Shield
to sit
hard against
Blockwork .
Non Combustible
Material in this zone
Step 2 :
Rivet 2X Side Panels to pre assembled
Back Panels as shown in 2:1 , ensure
the Top Flange on the Back Panel sits
on the Side Panels creating a 20mm Air
Gap at the bottom for the Caitec Air
Venting .