Warmington TF 1000 Installation Instructions Manual - page 5
16 December 2014
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm……….Copyright
5
FIREBOX INSTALLATION
This is a general installation guide only – Contact a “NZHHA Installer” for Installation Advice or go to
www..homeheat.co.nz then select Members & follow Instructions , to find a Certified NZHHA SFAIT Installer .
1.
All the dimensions are minimums
2.
Fit the Plinth into position in the Cavity. If onto a wooden floor ensure that an insulating plinth is fitted as per the specifications.
Ensure that the plinth is elevated to allow for finishing on the hearth. (See Hearth and plinth details)
3.
Fit the firebox into the Cavity. Bolt the fire box to the plinth or through to the floor with the bolting point provided on the Left and
Right hand sides of the fire box or drill holes through base for Bolts (seismic restraints bolts not provided).
4.
Fit the Adaptor to the Fire box. Ensure that exhaust sealant is used between the fire and Adaptor. Bolt into position with the bolt
in the Left and right hand sides of the Fire box.
5.
Install the flue system. Ensure that the Flue system comply to ASNZS 2918
6.
Fit the
Autoclaved Aerated Concrete (AAC)
Heat cell around the fire. A general minimum lay out is shown in this
Specification.
Note: Hearth and Plinth Construction.
For combustible flooring an insulating hearth and plinth of
75mm Hebel is required.
Plinth to be off set above hearth by the hearth finishing’s
( e.g. tiles / granite / plaster / etc )
Visit the Warmington Web Site for “Autoclaved Aerated Concrete
(AAC) ” instruction (PDF Download).. www.warmington.co.nz
IMPORTANT NOTE :
*Note: If Solid Plastering the Heat Cell structure, it is
recommended to use a fibreglass mesh with a latex
plaster to minimise the chance of the plaster cracking. (See
your plasterer for correct materials and applications).
HEARTH & PLINTH CONSTRUCTION DETAILS
CAITEC Air Venting System
Caitec" draws air from an external air
source to ensure that the open fire has
pre-heated combustion air maximising
efficiency while maintaining the home at
constant pressure equilibrium, reducing
the risk of back drafting .
Ensure that the cavity is vented to
Outside Fresh Air and the Warmington
Fire will take care of the rest. 2 x
100mm Diameter vent are required (Or
equivalent to that.)
Builder to supply external air to the
Cavity and the “Warmington Fire”
takes care of the rest.
“CAITEC” TECHNOLOGY—ROOM AIR REPLACEMENT
External Air Supply for “Caitec Air” and Cooling
Rear View of Autoclaved Aerated Concrete (AAC) Heat cell and fire box.
Offset
Offset for
Hearth
Finishing
Hearth
Plinth