Watersource Water Softener Operating Manual - page 3
watersource
W a t e r S o f t e n e r O p e r a t i n g M a n u a l
Connecting To The System
To allow for connection to your plumbing system your new softener has
been supplied with 3/4 bsp male threads. This means connections may be
made with either washing machine hoses or hard plumbing. Remember
with pex piping always use inserts when using compression fittings.
3.Settings
Time Controlled (T.C.)
Press up and down buttons together and hold until the lock
1.
disappears.
Press the button. The signifies that the engineering mode has
2.
been entered. Press the button again to make the hours flash.
Use the up and down arrows to adjust the hour. Repeat to adjust the
minutes. Press button again and the controller will beep to signify
that the setting has been accepted.
Press the down button to select the Regeneration time. Factory set
3.
for 2 am. To by-pass this step press down button again. To adjust,
press the button to select the hour and use up and down buttons
to adjust. Repeat for minutes.
Press button to adjust days between regenerations use up and
4.
down buttons. Factory set to 3 days.
Press button to exit menu.
5.
Metered or Volumetric
Press up and down buttons together and hold until the lock
1.
disappears.
Press the to select. The signifies that the engineering mode
2.
has been entered. Press the button again to make the hours
flash. Use the up and down arrows to adjust the hour. Repeat to
adjust the minutes. Press button again and the controller will
beep to signify that the setting has been accepted.
Press down button. A-01 will show. Press down button again to adjust
3.
Regeneration time. Factory set for 2 am. To by-pass this step press
down button again. To adjust, press the button to select the hour
and use up and down buttons to adjust. Repeat for minutes.
Press the down button again to adjust the softening capacity. Press
4.
button to adjust. Use up and down buttons to adjust. See capacity
chart to find correct setting. Factory set to 380 ppm hardness.
The lock will set automatically. Programming is complete.
5.
Outlet valve
shown open
Outlet from
softner
By-pass valve
shown closed
Inlet valve
shown open
Inlet
from
mains
Inlet to softner
Non-return
valve
Two Cores Socket
(connect with the transformer)
Control Panel
Microcomputer Controller
Brine Line Connector
Injector
Drain Outlet
Drive
Control Valve
Water Inlet
Water Outlet
Base
Riser Pipe (inside the base)