WEG SSW-07 User Manual - page 17
of
53
Chapter 3 - INStaLLatION aND CONNeCtION
16
English
The power terminal blocks vary in size and configuration, depending
on the SSW-07 soft-starter model, as can be observed at the figures
3.5 and 3.6.
Terminals:
R / 1L1, S / 3L2 and T / 5L3: AC supply line.
U / 2T1, V / 4T2 and W / 6T3: Motor connection.
3.2.1 Power
Terminals
Figure 3.4
- Standard power/grounding connections
Line
Circuit-breaker
Fuses
T
S
R
R/1L1 S/3L2 T/5L3
U/2T1 V/4T2 W/6T3 PE
PE
PE