Wood Stone PHOENIX 4343 WS-PX-4343-RFG-LR Installation And Operation Manual

Manual is about: Gas-Fired Stone Hearth Oven

Summary of PHOENIX 4343 WS-PX-4343-RFG-LR

  • Page 1

    Phoenix gas-fired stone hearth oven commercial dual burner model phoenix 4343 ws-px-4343-rfg-lr phoenix 4355 ws-px-4355-rfg-lr phoenix 4355 ws-px-4836-rfg-lr installation and operation manual woodstone-corp.Com revised july 2015 doc no: m0030.03 wood stone corporation 1801 w. Bakerview rd. Bellingha...

  • Page 2

    2 an ongoing program of product improvement may require us to change specifications without notice. Phoenix dual burner oven. Revised july 2015. Doc no: m0030.03 info@woodstone-corp.Com or visit woodstone-corp.Com wood stone corporation 1801 w. Bakerview rd. Bellingham, wa 98226 usa t. +1.360.650.11...

  • Page 3

    3 installation and operation manual for the wood stone dual burner phoenix natural gas or propane fueled dual burner stone hearth oven ws-px-4343-rfg-lr, ws-px-4355-rfg-lr and ws-px-4836-rfg-lr additional copies available upon request an ongoing program of product improvement may require us to chang...

  • Page 4

    4 important: consult your local gas supplier for a statement outlining a procedure to be followed in the event you smell gas. Post the statement in a prominent location. When this oven is not properly installed, a fire may result. To reduce the risk of fire, follow the installation instructions. It ...

  • Page 5

    5 save the instructions for your safety: do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance. Pour votre sÉcuritÉ: ne pas entreposer ni utiliser d’essence ou d’autres vapeurs de liquides inflammables ou des liquides dans les environs de ce...

  • Page 6

    6 utilities specifications gas: 19mm (3/4") fnpt gas inlet 105,000 btu/hr natural gas (ng) or 105,000 btu/hr propane (lp) maximum gas inlet pressure 1/2 psi (14 inches wc) electrical 120 vac, 2 a, 60 hz optional: 240 vac, 1 a, 60 hz all utility connections made on the back of the oven control box re...

  • Page 7

    7 air intake: do not facade or cover over must be left removable for service utilities specifications gas: 19mm (3/4") fnpt gas inlet 151,000 btu/hr natural gas (ng) or 151,000 btu/hr propane (lp) maximum gas inlet pressure 1/2 psi (14 inches wc) electrical 120 vac, 2 a, 60 hz optional: 240 vac, 1 a...

  • Page 8

    8 utilities specifications gas: 3/4 inch fnpt gas inlet 105,000 btu/hr natural gas (ng) or 100,000 btu/hr propane (lp) maximum gas inlet pressure 1/2 psi (14 inches wc) side view rear view plan view rev: legend: part #: ws-bl-4355 shown bl-rfg-lr (pita oven) - all sizes general arrangement 5/30/2013...

  • Page 9

    9 if you received your phoenix oven disassembled, go to the assembly section placing the oven the oven must be installed on a flat level surface the weight of the oven is carried by the full perimeter of the oven stand if it is necessary to shim the oven for leveling purposes, it is critical that th...

  • Page 10

    10 clearances 1. The wood stone phoenix oven must have a minimum 25 mm (1") clearance to combustibles from all sides, 152 mm (6") clearance to combustibles from the top and 152 mm (6") from the flue collar. If building a facade that will contact the oven, use completely non-combustible materials any...

  • Page 11

    11 all of the combustion products and cooking vapors from the wood stone phoenix oven pass through the 10-inch diameter flue collar located on top of the oven at the front the oven can be connected to a power-ventilated, grease-rated chimney, or placed under a listed type 1 exhaust hood installation...

  • Page 12

    12 12 phoenix dual burner oven installation and operation manual phoenix dual burner oven installation and operation manual 1. Use a forklift or other suitable lifting means to set the oven body onto 4x4" blocks oriented as shown refer to disassembly section of manual for disassembly instructions ov...

  • Page 13

    13 13 phoenix dual burner oven installation and operation manual phoenix dual burner oven installation and operation manual 6. Attach strap to the clevises at the top of each pickeye insert using an appropriate hoist or lift, tilt the oven on its back, onto 4x4" blocks 7. Change the position of the ...

  • Page 14

    14 an ongoing program of product improvement may require us to change specifications without notice. Phoenix dual burner oven. Revised july 2015. Doc no: m0030.03 info@woodstone-corp.Com or visit woodstone-corp.Com wood stone corporation 1801 w. Bakerview rd. Bellingham, wa 98226 usa t. +1.360.650.1...

  • Page 15

    15 an ongoing program of product improvement may require us to change specifications without notice. Phoenix dual burner oven. Revised july 2015. Doc no: m0030.03 info@woodstone-corp.Com or visit woodstone-corp.Com wood stone corporation 1801 w. Bakerview rd. Bellingham, wa 98226 usa t. +1.360.650.1...

  • Page 16

    16 an ongoing program of product improvement may require us to change specifications without notice. Phoenix dual burner oven. Revised july 2015. Doc no: m0030.03 info@woodstone-corp.Com or visit woodstone-corp.Com wood stone corporation 1801 w. Bakerview rd. Bellingham, wa 98226 usa t. +1.360.650.1...

  • Page 17

    17 an ongoing program of product improvement may require us to change specifications without notice. Phoenix dual burner oven. Revised july 2015. Doc no: m0030.03 info@woodstone-corp.Com or visit woodstone-corp.Com wood stone corporation 1801 w. Bakerview rd. Bellingham, wa 98226 usa t. +1.360.650.1...

  • Page 18

    18 an ongoing program of product improvement may require us to change specifications without notice. Phoenix dual burner oven. Revised july 2015. Doc no: m0030.03 info@woodstone-corp.Com or visit woodstone-corp.Com wood stone corporation 1801 w. Bakerview rd. Bellingham, wa 98226 usa t. +1.360.650.1...

  • Page 19

    19 an ongoing program of product improvement may require us to change specifications without notice. Phoenix dual burner oven. Revised july 2015. Doc no: m0030.03 info@woodstone-corp.Com or visit woodstone-corp.Com wood stone corporation 1801 w. Bakerview rd. Bellingham, wa 98226 usa t. +1.360.650.1...

  • Page 20

    20 13. Make gas connection at the rear of the control box gas and electrical connections must comply with all relevant national and local codes, and in a manner acceptable to the authority having jurisdiction knockouts are provided on the rear of the oven stand for the incoming gas and electrical su...

  • Page 21

    21 the installation must conform with local codes, or in the absence of local codes with the national fuel gas code, ansi 223.1 or natural gas installation code, can/cga-b149.1, as applicable, including: 1. The appliance and its individual shutoff valve (supplied by others) must be disconnected from...

  • Page 22

    22 installation of optional storage box file location: \\woodstone.Net\dfs\cad\0_ovens\z_be na_prelim\bistro_box\ws-bl-4343.Dft rev: date: part #: bistro commercial series - 4343 6/11/2013 bena dwn by: sheet: bistro commercial series - 4343 general arrangement 0 1 of 1 item part number rev descripti...

  • Page 23

    23 controller functions on/off button press to turn display on and off temperature units press and hold to switch between fahrenheit and celsius hearth temperature the hearth temperature will be displayed when the oven is turned on sensor is embedded 1" below hearth surface display will read “lo” wh...

  • Page 24

    24 initial oven start-up important: if at any time you feel that either or both of the burners are not operating properly, turn the oven off and call for service before servicing, disconnect the electrical supply at the breaker and turn off the gas supply at the appliance’s individual gas shutoff va...

  • Page 25

    25 important note on dual burner models the (2) flame height control knobs are linked together for ease of use turning either knob will raise or lower both flames if you wish to unlink the knobs for individual control of each burner, please contact the factory for instructions daily oven operation t...

  • Page 26

    26 do not pour or spray liquids onto the oven deck or into the oven interior as this can damage the ceramic and will void the warranty. There is a stainless steel burner guard to prevent food from falling on and thereby obstructing the gas orifices of the radiant flame if food gets into the radiant ...

  • Page 27

    27 controller will not turn on flame does not light flame cuts out display reads “open” 1. Incoming power to oven turned off check circuit breaker for circuit supplying the oven check that any wall switches external to the oven that control oven power are turned on check that any interlocks external...

  • Page 28

    28 120 vac electrical diagram dual rfg date: diag #: wd075 rev. 1 11/12/2014 bellingham, wa +1(360)650-1111 www.Woodstone-corp.Com radiant right junction box l n g cb 4a gnd xfmr 110-120 vac 50/60hz wired by others white brown brown blue yellow temperature controller control panel type 4 10 9 8 7 6 ...

  • Page 29

    29 240 vac electrical diagram dual rfg date: diag #: w d078 rev. 0 7/17/2014 bellingham, wa +1(360)650-1111 www.Woodstone-corp.Com radiant right junction box l n g fuse f1 - 5a gnd xfmr 230 - 240 vac 50/60hz wired by others w hite brown brown pink w hite temperature controller control panel type 4 1...

  • Page 30

    30 120 vac oven circuit 120 vac to oven s1 is a double pole, single throw (dpst) switch provided by others. 120 vac to fan wired by others s1 120 vac fan circuit interlock of oven control to an exhaust fan this connection is intended to interrupt power to the oven until the fan is turned on s1 is a ...

  • Page 31

    31 wood stone warrants its equipment to the original purchaser against defects in material or manufacture for a period of one year from the original date of purchase, subject to the following exclusions and limitations. Contact your local distributor for warranty service exclusions the warranties pr...