Zanussi ZGF 7899 Instruction Booklet

Summary of ZGF 7899

  • Page 1

    Gas hob zgf 7899 instruction booklet il 35687-9001.

  • Page 2

    2.

  • Page 3: Important Safety Information

    3 important safety information you must read these warnings carefully before installing or using the appliance. Installation z z z z z this appliance must be installed, regulated and set for operation by qualified personnel with proper authorization from the ministry of labour, according to the manu...

  • Page 4: For The User

    4 for the user important safety information page 3 description of the hob page 4 operation page 5 maintenance and cleaning page 6 something not working? Page 7 for the installer engineerstechnical data page 7 installation page 8 gas connection page 8 building in page 9 fitting the hob to the worktop...

  • Page 5: Operation

    5 operation to light a burner: z push in the relevant knob and turn it anticlockwise to "maximum position". Z at the same time, keep the knob pushed down for about 5 seconds. This will allow the "thermocouple" (fig. 1, lett. D) to be heated and the safety device to be switched off, otherwise the gas...

  • Page 6: The Hob Top

    6 before any maintenance or cleaning can be carried out, you must disconnect the hob from the electricity supply. The hob is best cleaned whilst it is still warm, as spillage can be removed more easily than if it is left to cool. The hob top regularly wipe over the hob top using a soft cloth well wr...

  • Page 7: Engineers Technical Data

    7 overall dimensions width: 680 mm depth: 510 mm height: 85 mm cut out dimensions width: 560 mm depth: 480 mm thickness: 30 mm instructions for the installer engineers technical data supply connections gas: rc 1/2 inch (1/2 inch male) rear right hand corner electric: 230-v 50 hz supply, 3 core flexi...

  • Page 8: Installation

    8 rectangular cut-out size for hob fo 2038 dimensions are given in mm. Installation cut out size the dimensions of the cut-out are given in figure 3. A) end of shaft with nut b) washer c) adjustable joint important this appliance must be installed by qualified personnel. The manufacturer will not ac...

  • Page 9: Building In

    9 building in building over a cupboard or drawer if the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface. Building over a kitchen unit with door proper arrangements must be taken in des...

  • Page 10

    10 fo 0199 a carry out the building in of the hob as follows: • put the seals supplied with the hob, on the edges of the cut out: place them at 8 mm from the front and rear edge and at 50 mm from the side edges, as shown in figure 4, taking care that the seals meet without overlapping; • place the h...

  • Page 11: Commissioning

    11 commissioning when the hob has been fully installed it will be necessary to check the minimum flame setting. To do this, follow the procedure below. - turn the gas tap to the max position and ignite. - set the gas tap to the min flame position then turn the control knob from min to max several ti...