ABS AFP 0831S Installation And Operating Instructions Manual - page 6
InstallationandOperatingInstructions
ABS submersible sewage pump AFP 0831S and 0841S
.3
Electricalconnection
c
Before commissioning an expert should check that one of the necessary electrical protective devices
is available. Earthing, neutral, earth leakage circuit breakers, etc. must comply with the regulations
of the local electricity supply authority and a qualified person should check that these are in perfect
order.
ATTENTION
ThepowersupplysystemonsitemustcomplywithVDEorotherlocalregulations
withregardtocross-sectionalareaandmaximumvoltagedrop.Thevoltagestatedon
thenameplateofthepumpmustcorrespondtothatofthemains.
The power supply cable must be protected by an adequately dimensioned slow-blow fuse corresponding to the
rated power of the pump.
c
The incoming power supply as well as the connection of the pump itself to the terminals on the control
panel must comply with the circuit diagram of the control panel as well as the motor connection
diagrams and must be carried out by a qualified person.
All relevant safety regulations as well as general good technical practice must be complied with.
ATTENTION
Foruseintheopenair,thefollowingVDEregulationsapply:
Submersible pumps used outdoors must be fitted with a power cable of at least 10 metre length. Other
regulations may apply in different countries.
Pumps for use in swimming pools, garden ponds, and similar, must comply with European Standard 60335,
Part 2, protection class I.
NOTE
Pleaseconsultyourelectrician.
.3.1
Wiringdiagrams
ThreePhase
AFP50Hz:
AFP60Hz:
S13/4 D, S22/4 D
S16/4 D, S25/4 D
1013-00
1014-00
1015-00
Three Phase Wiring
Three Phase Wiring with
Temperature Limiter
Three Phase Wiring with
Temperature Limiter & DI
NOTE:
U1,V1,W1
=
Live
br
=
brown
PE
=
Earth
gr/yel
=
green/yellow
blk
=
black
Di
=
Seal monitor
bl
=
blue
F1/FO
=
Thermal sensor
ATTENTION
Explosion-proofpumpsmayonlybeusedinexplosivezoneswiththethermal
sensorsfitted(Leads:FO,F1).