2015/0 Rev. 2.0
COMBI LINE
21
GB
3.
InsTaLLaTIon
This appliance may only be positioned and connected by a qualified service engineer.
3.1
placing the container
-
Position the container on a counter which has a firm and even surface.
-
When the container is positioned on a serving trolley, the container must minial be fixed with
Animo locating lug or lock-ring.
3.2
Connecting to the electrical supply system
Supply voltages and frequencies can differ between countries. Check if the appliance is suitable for
connection to the local power mains. Check if the details on the type plate correspond.
Connect the appliance to an earthed wall socket.
4. preparaTIons Before use
The following actions should be carried out before a new appliance is used.
4.1 Model Cne (electrical)
1. Rinse the inner pot with a clean wet cloth.
2. Put the cable with inlet plug into the back of the container and insert the plug into the socket of
the flow water heater.
3. The container is now ready for use.
4.2 Model Cni (insulated)
1. Rinse the inner pot with a clean wet cloth.
2. Pre heat the container by filling it with approx. 2 litres of hot water for at least 5 minutes.
3. The container is now ready for use.
WarnIng
•
Never submerge or spray the appliance (only CNe).
•
Have all repairs carried out by a qualified technician.
•
Protect the controls against dirt and grease.
•
During use some parts will become very hot.
•
Do not position the container on open fire or on a hotplate.
•
First disconnect the electric cable before transporting the container (only CNe).
•
It is advisable to take the plug out of the socket (only CNe).