B.K.I. Inc RGT-3001 Owner's Installation And Operation Manual - Royal Guardian,
Blaze King
,
Royal Guardian,
Model RGT-3001
OWNER'S INSTALLATION AND OPERATION MANUAL
Page
Page
Page
Page 22
22
22
22
Date Printed: Tuesday, February 08, 2005
OM
OM
OM
OM----RGT
RGT
RGT
RGT.PUB
.PUB
.PUB
.PUB
Revision Date: 11/10/2004
D. MOBILE HOME (FIG. 23,30), MOBILE HOME ALCOVE (FIG. 22), MOBILE HOME CORNER (FIG. 21), AND
RESIDENTIAL ALCOVE (FIG. 22), INSTALLATIONS USING PREFABRICATED CHIMNEY. Refer to Page
18, Fig. 21, 22, 23, and Fig. 30 below.
NOTES:
1.
For MOBILE HOME installations, use these instructions with Mobile Home Kit #8340AA and Insulated Pipe components.
The use of components, other than those specified, is not allowed.
2.
For MINIMUM CLEARANCE residential alcove installations, use these instructions. Alcove Kit #8339AA and Insulated Pipe
components. The Outside Air Kit is not required for residential alcove installations.
WARNING - DO NOT INSTALL IN SLEEPING ROOM
CAUTION - THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND CEILING/ROOF
MUST BE MAINTAINED.
1.
Set floor protector and stove in location for marking holes in accordance with the label and figures of these instructions.
2.
Mark the position for the hole in the ceiling and roof using a string and plumb-bob.
3.
Check that the intended location will not interfere with floor joists, ceiling joists, or rafters before proceeding further.
4.
Mark the positions for the tie down and the hole for the outside air pipe.
5.
Move the stove and using a saber saw with a suitable blade, cut a 6 1/2" hole for the outside air pipe and install as per
instructions, Page 47. Drill a pilot hole for the tie down.
6.
Cut a pilot hole in the ceiling.
7.
Cut a hole for the ceiling penetration components and frame in the sides of this hole in both the ceiling and roof. Refer to
pipe manufacturers installation instructions. Install the support box. Be sure all options including outside air cap, flange,
collar and pipe are installed at this point before putting the stove in its final position.
8.
Slide the stove back into position.
9.
Install the tie down through the stove base.
10. To install Close Clearance Connector to the stove, slip the lower end marked by arrow inside the Smoke Collar. Fasten
chimney connector to stove with screws provided. Slide connector up and snap into ceiling support. (Make sure it "snaps"
in place). Refer to the pipe manufacturer's Installation Instructions.
11. Following the Pipe Manufacturer's Installation Instructions, install chimney system into support box, slip the roof flashing
down over the chimney and secure to the roof, being careful to keep the pipe centered in the opening. NOTE: To meet the
code, the chimney must extend above the roof at least three feet and two feet above any area of the roof within ten feet of
the chimney termination.
12. Install the Outside Air Pipe 4" flex tube.
ROOF EXIT
For Figures 21 and 23, Page 18
Residential Reduced Back Clearance & Alcove
FIGURE 30
Mobile Home & Residential Installation using an approved
Chimney System and close clearance connector.
(for information on approved chimney systems please see page
25 of this manual of your approved label on the rear of the stove)
2’ min
10’
3’ min
Storm
Collar
Roof
Flashing
Chimney
System
Starter Section
Support Box
Shown With
Side Shield:
Requirement #2
Combustable Wall
Floor Protector
Attach chimney connector to
collar with screws provided
6” Diam. 24/26 MSG. Black/Blue
Steel Chimney Connector with
listed residential type and building
heating appliance chimney system.
Shown with Mobile
Home & Mobile
Home Alcove Kit
Insulation Shield
Back Shield
Mobile Home Outside Air
Mobile Home Parallel, Corner & Alcove:
See Requirement #5, Page 17.
See Requirement #3, Page 17