Barkman Harvest Grove BBQ Grill Instruction Manual

Summary of Harvest Grove BBQ Grill

  • Page 1

    Bbq grill instruction manual outdoor kitchen kit collection harvest grove outdoor kitchen bbq grill instruction manual.

  • Page 2

    For any issues on sunstone steel components or warranty claims, please call texas bbq wholesalers at 888-934-9449 or email them at service@sunstonemetalproducts.Com. 2 scan our qr code to watch our online instruction videos or go to youtube.Com/ barkmanconcrete.

  • Page 3

    Materials included: 12” standard quarry stone - 57 pieces 8” standard quarry stone -3 pieces 4” standard quarry stone - 9 pieces 4” x 12” x 6” quarry stone - 6 pieces 4” x 8” x 6 1/8 ” quarry stone -9 pieces 4” x 8” x 2 1/8” quarry stone - 8 pieces 4-piece ebony accent band 3-piece ebony countertop ...

  • Page 4

    4” x 8” x 2 1 / 8 ” quarry stone 4” x 8” x 6 1 / 8 ” quarry stone 4” x 12” x 6” quarry stone 8” standard quarry stone 4” standard quarry stone 12” standard quarry stone 4.

  • Page 5

    Double door tank holder and dual drawers tank and drawer frame stainless steel vent box 4 burner grill 34 ir 3-piece ebony countertop 4-piece ebony accent band 5.

  • Page 6

    Step 2 lay down the stone pattern shown using 12”, 4” standard and 4”x8”x2 1 / 8 ” pieces along with the vent box. Glue this layer down to the 1 st layer. Lay down the stone pattern shown using 12”, 8”, 4” standard and 4”x8”x6 1 / 8 ” pieces along with the tank and drawer frame. Glue the cut ends of...

  • Page 7

    Step 4 lay down the stone pattern shown using 12” standard and 4”x8”x2 1 / 8 ” pieces. Repeat the pattern from step 1. Step 3 7.

  • Page 8

    Step 6 lay down the 4-piece accent band as shown. Make sure all 4 pieces are level. Glue this down to the tank and drawer frame and quarry stone below. Repeat patterns from steps 3 & 4. Make sure this layer is flush with the top of the frame. If installing with the side burner, do so on the right-ha...

  • Page 9

    Lay down the stone pattern shown using 12”, 4” standard, 4”x12”x6”, and 4”x8”x6 1 / 8 ” pieces. Make sure that all pieces on this layer are level to receive the countertop. Step 8 step 7 lay down the stone pattern shown using 12” standard, 4”x12”x6” and 4”x8”x2 1 / 8 ” pieces. 9.

  • Page 10

    Insert the double door tank holder and dual drawers into the tank and drawer frame. Use the included shims to ensure it fits snug and remains square. Remove the tank holder and drawers from the sliders by pressing on the black tabs. Step 10 step 9 lay down the 3-piece ebony countertop as shown. Make...

  • Page 11

    Step 11 pre-drill holes into the tank and drawer frame through openings in the double door tank holder and dual drawers with the drill bit provided. Fasten in place with the provided concrete screws (do not overtighten). Reinsert the drawers and tank holders thereafter. Place the 4-burner grill 34in...

  • Page 12

    Www.Barkmanconcrete.Com follow barkman concrete on facebook, twitter @barkmanconcrete and visit our youtube channel. M ad e i n c an ada . Barkman concrete limited steinbach office 152 brandt street, steinbach, mb r5g 0r2 t 204 326 3445 or 1 800 461 2278 f 204 326 5915 steinbach@barkmanconcrete.Com ...