Barkman Side burner Instruction Manual - page 2
2
Materials Included:
12” standard quarry stone - 47 pieces
8” standard quarry stone - 8 pieces
4” standard quarry stone - 18 pieces
4” x 4” x 12” quarry stone - 2 pieces
stainless steel vent box
1-piece ebony accent
1-piece ebony countertop
slide-in double side burner (liquid propane
ready)
propane line splitter kit (propane only)
Sunstone manual for side burner
plastic shims
1 tube of landscape glue
gloves
instruction guide
installation video
landscape design plan
Notes:
If installing your side burner on an
unstructured base, please ensure to follow
these steps:
• Excavate area approx. 9” below grade
• Excavate approx. 6” larger than your
actual kit dimensions to ensure a
stable base.
• Fill with ¾” down limestone and
compact firmly
• Level out ½” of sand and install kit as
per the instruction guide.
• If you are installing on a solid base
such as an existing patio and/or base
prep is not necessary, then you can
proceed to the first step.
These instructions may not refer to all base
conditions. Base prep will greatly depend
on existing ground conditions and may
require alternate techniques.
For the use of propane or natural gas with
this product, consult your local building
code and/or bylaws for regulations. Natural
gas conversion kit is available for purchase
separately.
Scan our QR code
to watch our online
instruction videos or
go to youtube.com/
barkmanconcrete