Bunn Dual GPR DBC Installation & Operating Manual

Other manuals for Dual GPR DBC: Programming Manual

Summary of Dual GPR DBC

  • Page 1

    Bunn-o-matic corporation post office box 3227 springfield, illinois 62708-3227 phone: (217) 529-6601 fax: (217) 529-6644 to ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit the bunn-o-matic website, at www.Bunn.Com. This is absolutely free, a...

  • Page 2

    Page 2 introduction the brewer incorporates a wireless interface system that allows the dbc grinder to load certain information into the "programming chip" located inside the handle of the funnel. This information includes what flavor of coffee is being ground and what batch size will be brewed (sma...

  • Page 3: Main On/off

    Page 3 00656.0001 00986.0000 00658.0000 20201.5600 user notices the notices on this brewer should be kept in good condition. Replace unreadable or damaged labels. 37881.0000 03408.0004 03409.0004 artwork for p/n: 39803.0000 artwork rev: a drawn: ref date: 02/26/07 main on/off switch 39803.0000 12364...

  • Page 4

    Page 4 l2 white/violet white neutral l1 black 120 v.A.C. 120 v.A.C. 208 or 240 v a.C. P1841 requirements for brewers without an attached cord set are as follows: electrical requirements warning - the brewer must be disconnected from the power source until specified in initial set-up. Refer to data p...

  • Page 5

    Page 5 operating controls b b c c d d e f g h h j p3268.25 ma in on/ of f sw itc h a (a) main on/off switch this switch, located under the brewer behind the right front leg, turns power on and off to all components in the brewer. (b) batch selector switches pressing the switch corresponding to the s...

  • Page 6

    Page 6 initial setup caution: the brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions. 1. Insert an empty funnel into the funnel rails of one of the brew stations. 2. Place an empty server under the funnel. 3. Connect the brewer t...

  • Page 7

    Page 7 set ready - range: 185˚f (85˚c) to 203˚f (95˚c) this function allows the operator to set the minimum temperature allowable to start a brew cycle. The range can be from 185˚f (85˚c) to within 2˚f (-1.7°c) of the set temp. The water must be at the set ready tempera- ture or higher for the displ...

  • Page 8

    Page 8 cleaning 1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on bunn-o-matic equipment. 2. Check and clean the sprayhead. Use the pointed end of sprayhead cleaning tool (#38227.0000) to remove any mineral deposits from the spra...