Bunn SINGLE GPR DBC-DV Installation & Operating Manual

Other manuals for SINGLE GPR DBC-DV: Programming Manual

Summary of SINGLE GPR DBC-DV

  • Page 1

    Installation & operating guide single ® gpr dbc-dv with smart funnel ® dual voltage model bunn-o-matic corporation post office box 3227 springfield, illinois 62708-3227 phone: (217) 529-6601 fax: (217) 529-6644 to ensure you have the latest revision of the manual or to obtain the illustrated parts c...

  • Page 2

    Page 2 37994.1 080813 introduction the brewer incorporates a wireless interface system that allows the dbc grinder to load certain information into the "programming chip" located inside the handle of the funnel. This information includes what flavor of coffee is being ground and what batch size will...

  • Page 3: Main On/off

    Page 3 00656.0001 00986.0000 00658.0000 20201.5600 user notices the notices on this brewer should be kept in good condition. Replace unreadable or damaged labels. As directed in the international plumbing code of the international code council and the food code manual of the food and drug administra...

  • Page 4

    Page 4 white/violet blue white back front 120/208v 120/240v 120v electrical hook-up caution: improper electrical installation will damage electronic components. 1. An electrician must provide electrical service. 2. Determine the available on-site electrical service. 3. Select the desired unit voltag...

  • Page 5

    Page 5 plumbing requirements this brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kpa) from a 1 ⁄ 2 " or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is...

  • Page 6

    Page 6 on / off operating controls (a) main on/off switch this switch, located under the brewer behind the right front leg, turns power on and off to all components in the brewer. (b) batch selector switches pressing the switch corresponding to the small, medium, or large batch selects the amount of...

  • Page 7

    Page 7 initial setup caution – the brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions. 1. Insert an empty funnel into the funnel rails of one of the brew stations. 2. Place an empty server under the funnel. 3. Connect the brewer ...

  • Page 8

    Page 8 set ready - range: 185˚f (85˚c) to 203˚f (95˚c) this function allows the operator to set the minimum temperature allowable to start a brew cycle. The range can be from 185˚f (85˚c) to within 2˚f (-1.7°c) of the set temp. The water must be at the set ready tempera- ture or higher for the displ...

  • Page 9

    Page 9 cleaning 1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on bunn-o-matic equipment. 2. Check and clean the sprayhead. Use the pointed end of sprayhead cleaning tool (#38227.0000) to remove any mineral deposits from the spra...